Location
Golden, British Columbia
Expertise
Bridges
Share
The $11.6 million, 270 m long Yoho Bridge is the first major bridge to be replaced under the joint federal/provincial Trans Canada Highway Improvement Program.
The existing bridge was constructed in 1958 to carry the highway across the Kicking Horse River and the Canadian Pacific Railway. The aging structure has a substandard alignment and deck width. The new four-lane structure is designed to a 100 km/h alignment standard.
The Ministry of Transportation’s project management team retained Associated Engineering subsidiary, Brybil Projects Ltd., in a joint venture with Urban Systems and Sandwell, to prepare a design using structural concrete. The contract was awarded to Peter Kiewit, who tendered the concrete design. We also prepared designs for a rock fall catch wall and structural retaining walls on the approaches.

Client
The Ministry of Transportation’s
Awards
Consulting Engineers of BC Award of Excellence.

Project Highlights
$11.6M
Investment
270m
Length
100km/h
alignment standard
The Yoho Bridge site is among the most challenging in the Province. There are major issues concerning geotechnical stability, rockfall hazard, construction access, traffic management, and construction sequencing. The design selected uses modified precast concrete I-girders, supported by structural steel composite delta frames to suit the 64 m long river span required. Twin staggered superstructures were adopted to accommodate the skew crossing, while piled slabs with voided concrete abutments were used on the approaches to mitigate stability concerns. The design allowed the girders to be erected by launching.
The project received a 2005 Consulting Engineers of BC Award of Excellence.
More Bridges Projects
See all projects

Bridges
Deh Cho Bridge

Bridges
Lake City Overhead Seismic Retrofit and Structural Rehabilitation

Transportation
Haisla Bridge Replacement

Transportation
Ray Gibbon Drive Twinning

Transit
SkyTrain Crossing of South Point Drive

Bridges
Beaverdams Road and Power Canal Bridges

Bridges
SkyTrain Grandview Cut Structural Upgrade

Transportation
184 Street and Yellowhead Trail Interchange

Bridges
Sucker River Bridge Replacement

Bridges
Battle Creek Road Bridge Replacement

Infrastructure
Baxter Bridge Rehabilitation

Transportation
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design

Transportation
Still Creek Pedestrian Bridge Replacement

Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit

Transportation
Medicine Hat Boardwalk Replacements
LEADERSHIP INSIGHTS
See all insights



