Location
Markham, Ontario
Expertise
Building Mechanical
Electrical Instrumentation & Controls
Energy
Share
The City of Markham retained Associated Engineering to perform an HVAC condition assessment of the Main Yard Works Facility.
After the assessment was completed, we also complete a Feasibility Study to evaluate the financial and technical feasibility of installing a stand-by generator that would provide back-up power to the facility. This was motivated by the fact that the facility was without power for days following an ice storm in 2013. Without power, the facility was unable to fuel the City’s service vehicles, including its snow plow trucks, salters, and fire fighting trucks.
Project Highlights
At Associated, we believe we have a responsibility to understand the impacts of climate change, inform our clients about the risks to their infrastructure and communities, and assist them in developing infrastructure solutions that are both resilient and help mitigate the effects of climate change. The natural gas generator increases the resilience of this facility, and will allow the City to participate in the IESO’s Demand Response program, thus leading to operational savings.
After the feasibility study was completed, reviewed and discussed with the City, we were retained to provide detailed design and construction administration services for the installation of the new generator. A 250 kW Natural Gas Generator complete with sound enclosure and manual transfer switch (at the request of the City) was installed and commissioned.
More Building Mechanical Projects
See all projects
Airports
Calgary Airport Glycol Treatment Facility
Building Mechanical
Jim Pattison Centre of Excellence Building Technologies and Renewable Energy Conservation
Building Mechanical
Hazardous Materials Survey and Abatement Monitoring of Buildings
Building Mechanical
Powell River WWTP
Infrastructure
Kikendaasogaming Elementary School Deficiency Repairs
Buildings
Simon Fraser University Parcel 21
Buildings
Stoney Nakoda Child & Family Services Building Assessment
Building Mechanical
Woodward WWTP Headworks Biofilter Upgrades
Building Mechanical
Scott Street Sewage Pumping Station Upgrades
Infrastructure
Tsawwassen First Nation Sewage Treatment Plant
Building Mechanical
St. Albert Naki Transit Centre and Park & Ride
Building Mechanical
Elijah Smith School Energy Audit
Building Mechanical
Eiling Kramer Campground Park Service Centre
Buildings
Chief Aranazhi School Upgrades
Buildings
North Wall Sewage Treatment Plant and Main Lift Station Upgrade
LEADERSHIP INSIGHTS
See all insights