Location
Welland, Ontario
Expertise
Water
Water Treatment
Water Supply, Storage, & Distribution
Electrical Instrumentation & Controls
Pump Stations
Electrical Instrumentation & Controls
Share
The proposed Phase 1 and Phase 2 upgrades at Welland Water Treatment Plant are critically important initiatives to ensure a reliable and affordable water supply into the future for the Region of Niagara, including the City of Welland, the Town of Pelham, and the City of Thorold.
Associated Engineering was engaged by the Region to provide the following services related to the Phase 1 upgrades:
- Preliminary Design
- Detailed Design
- Tendering
- Contract Administration
- SCADA system programming and Integration
- Construction Inspection
- Warranty Period Services
Project Highlights
The major components of this assignment include upgrades in the following areas:
- Disinfection (UV System and Chlorination)
- High Lift Pump Station
- Treated Water Storage Reservoir
- Distribution Watermains
- Electrical
- Demolition of Existing Buildings (Plant 2)
- Demolition of Existing Treated Water Storage Reservoir
More Water Projects
See all projects
Energy
Solar Feasibility Study for Medicine Hat Reservoirs
Pump Stations
12th Avenue Drainage Pump Station
Water
Japan Gulch Ultraviolet Disinfection Facility
Water
Fort Chipewyan Water Treatment Plant Expansion
Infrastructure
Pelican Lake First Nation Water Treatment Plant Expansion
Pump Stations
Skyline Pump Station
Environmental Planning
Watershed Resilience and Restoration Program: Identification of priority areas
Water Treatment
Russell Binscarth Water Treatment Plant
Infrastructure
Rosehill Reservoir Rehabilitation
Transportation
Kitsault Mine Access Road and Bridge Assessments
Infrastructure
Kluskus Village Domestic Water System Improvements
Water
Mill Creek Erosion Study
Pump Stations
Horseshoe Slough Drainage Pump Station
Water
Source Watershed Assessment
Water
Jericho Reservoir
LEADERSHIP INSIGHTS
See all insights