The proposed Phase 1 and Phase 2 upgrades at Welland Water Treatment Plant are critically important initiatives to ensure a reliable and affordable water supply into the future for the Region of Niagara, including the City of Welland, the Town of Pelham, and the City of Thorold.
Associated Engineering was engaged by the Region to provide the following services related to the Phase 1 upgrades:
- Preliminary Design
- Detailed Design
- Tendering
- Contract Administration
- SCADA system programming and Integration
- Construction Inspection
- Warranty Period Services
Project Highlights
The major components of this assignment include upgrades in the following areas:
- Disinfection (UV System and Chlorination)
- High Lift Pump Station
- Treated Water Storage Reservoir
- Distribution Watermains
- Electrical
- Demolition of Existing Buildings (Plant 2)
- Demolition of Existing Treated Water Storage Reservoir
More Water Projects
See all projects
Pump Stations
Avenue H Reservoir and Pump Station
Environmental
Big Bend Master Drainage Plan
Pump Stations
12th Avenue Drainage Pump Station
Buildings
North Wall Sewage Treatment Plant and Main Lift Station Upgrade
Energy
Solar Feasibility Study for Medicine Hat Reservoirs
Transportation
Kitsault Mine Access Road and Bridge Assessments
Water
Fort Chipewyan Water Treatment Plant Expansion
Water
Jericho Reservoir
Water
Mill Creek Erosion Study
Building Mechanical
Powell River WWTP
Infrastructure
Pelican Lake First Nation Water Treatment Plant Expansion
Buildings
Belle River Water Treatment Plant
Pump Stations
Horseshoe Slough Drainage Pump Station
Infrastructure
Trestle No. 3 Rehabilitation and Steel Pipe Replacement
Wastewater Treatment / Water Resource Recovery
Denare Beach Wastewater Treatment Plant Upgrades
LEADERSHIP INSIGHTS
See all insights