Following the wildfire in Waterton National Park in the summer of 2017, Parks Canada retained Associated Engineering to completed design and construction services for six damaged/destroyed bridges.
The scope of work included the development of standard bridge superstructures drawings to support standard replacement of National Park Bridges, with span lengths of 6, 10, 12, and 14 metres.
The bridges replaced included the Snowshoe Bridge, Akamina Pass Bridge, Dipper Ski Trail Briges #1 and #2, Experts Choice Bridge, and Bertha Falls Bridge.

Client
Parks Canada

Project Highlights
People on this project
More Transportation Projects
See all projects

Transportation
Fourth Street Pedestrian Overpass

Bridges
SkyTrain Grandview Cut Structural Upgrade

Transportation
Pitt River Bridge

Transportation
Pedestrian Bridge 151 Rehabilitation

Transportation
Highway 17 at County Road 508 Interchange

Transportation
Port Mann Highway 1 Improvements Highway, Structural and Drainage Engineering

Airports
Nanaimo Airport Airfield Electrical Upgrading

Roads
Highway 91/91A Queensborough and Howes Interchanges

Transportation
Freegold Road Functional Plan

Transportation
Battleford Truss Bridge Rehabilitation

Transportation
Whitemud Creek Oxbow Boardwalk

Roads
Johnson-Mariner Way Connector

Transportation
Regulatory Application and Approvals, Valley Line LRT

Transportation
Saline Creek Drive Pedestrian Bridge

Transportation
Sutherland Ave Pedestrian Bridge
LEADERSHIP INSIGHTS
See all insights