Location
Waterton National Park, Alberta
Expertise
Transportation
Bridges
Pedestrian Bridges
Share
Following the wildfire in Waterton National Park in the summer of 2017, Parks Canada retained Associated Engineering to completed design and construction services for six damaged/destroyed bridges.
The scope of work included the development of standard bridge superstructures drawings to support standard replacement of National Park Bridges, with span lengths of 6, 10, 12, and 14 metres.
The bridges replaced included the Snowshoe Bridge, Akamina Pass Bridge, Dipper Ski Trail Briges #1 and #2, Experts Choice Bridge, and Bertha Falls Bridge.
Client
Parks Canada
Project Highlights
People on this project
More Transportation Projects
See all projects
Transportation
Medicine Hat Transit ITS Decision Support
Transportation
Casino Mine Access Road
Streetscaping
Vanalman Avenue Upgrades
Pedestrian Bridges
Dayton Street Pedestrian and Cycling Overpass
Transportation
Duggan Bridge Replacement
Transportation
Cowichan Valley Trail Bridges Condition Inspection and Load Rating
Pedestrian Bridges
Hangingstone River Pedestrian Bridge
Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection
Infrastructure
Baxter Bridge Rehabilitation
Transportation
170th Street over CN Rail Bridge Rehabilitations
Airports
Vancouver International Airport Parallel Runway
Transportation
St. Andrews Lock and Dam Bridge Deck Replacement
Transportation
Ironworkers Memorial Second Narrows Bridge Fatigue Study
Transportation
7 Avenue S. Bike Boulevard
Roads
Johnson-Mariner Way Connector
LEADERSHIP INSIGHTS
See all insights