Location
Waterton National Park, Alberta
Expertise
Transportation
Bridges
Pedestrian Bridges
Share
Following the wildfire in Waterton National Park in the summer of 2017, Parks Canada retained Associated Engineering to completed design and construction services for six damaged/destroyed bridges.
The scope of work included the development of standard bridge superstructures drawings to support standard replacement of National Park Bridges, with span lengths of 6, 10, 12, and 14 metres.
The bridges replaced included the Snowshoe Bridge, Akamina Pass Bridge, Dipper Ski Trail Briges #1 and #2, Experts Choice Bridge, and Bertha Falls Bridge.
Client
Parks Canada
Project Highlights
People on this project
More Transportation Projects
See all projects
Bridges
Moody Street Overpass
Transportation
Cowichan Valley Trail Bridges Condition Inspection and Load Rating
Transportation
184 Street and Yellowhead Trail Interchange
Transportation
Ice Engineering and Ice Safety for Tibbitt-Contwoyto Winter Road
Streetscaping
Nigel Valley Public Spaces
Transportation
Outlook Truss Bridge Assessment
Infrastructure
Churchill Airport Runway Upgrades
Transportation
Port Mann Highway 1 Improvements Highway, Structural and Drainage Engineering
Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection
Transportation
Highway 17 at County Road 508 Interchange
Transportation
170th Street over CN Rail Bridge Rehabilitations
Transportation
Pioneer Pedestrian Bridge
Bridges
SkyTrain Grandview Cut Structural Upgrade
Transportation
Overlea Blvd. Bridge Rehabilitation
Transportation
Ice Engineering and Ice Safety at Milne Inlet
LEADERSHIP INSIGHTS
See all insights