Associated Engineering has a three-year Instrumentation & Control (I&C) Service Agreement with the Town of Sylvan Lake.
As the lead consultant, we provide the following services:
- Assessing existing SCADA infrastructure and providing a strategy for upgrading the operation network to provide the Town with the reliable and redundancy that will provide them with an acceptable level of risk
- Replacing obsolete and expired hardware from the Town’s infrastructure
- Integrating the Town’s infrastructure to SCADA network
- Providing documentation that outlines the standard for infrastructure design. Documentation includes acceptable EI&C hardware, general lift station control philosophy, PLC programming practices, and HMI configuration standard
- Maintaining 24/7 on-call services for the Town to assist operations in troubleshooting and repairing I&C network
Client
Town of Sylvan Lake
Construction Cost
$485,000
Project Highlights
More Energy Projects
See all projects
Energy
ENMAX District Energy Centre
Strategic Advisory Services
Lethbridge Energy Efficiency Master Plan and Strategy
Energy
Nelson District Energy Feasibility Study
Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study
Energy
Gateway Theatre Wastewater Heat Recovery
Building Mechanical
Residuals Treatment Facility
Energy
Fort McMurray Wastewater Treatment Plant – Instrumentation, Controls & Automation
Building Mechanical
Elijah Smith School Energy Audit
Energy
Minoru Aquatic Complex
Energy
British Columbia Lottery Corporation Geoexchange Feasibility Study
Energy
Site C Clean Energy
Climate Change Adaptation & Mitigation
Nanaimo Reservoir No. 1 and Energy Recovery Facility
Electrical Instrumentation & Controls
Solar Photovoltaic System Installation – WTP and Pumphouse
Energy
Red Deer Wastewater Treatment Plant – PLC, Instrumentation and Controls Retrofit
Building Mechanical