Location
Burnaby, British Columbia
Expertise
Transportation
Bridges
Pedestrian Bridges
Infrastructure
Parks & Recreation
Share
The Still Creek Pedestrian Bridge located in the northwestern portion of Burnaby Lake Regional Park, forms an important connection within the park drawing over 300,000 visitors per year.
Metro Vancouver retained Associated Engineering to provide engineering services for replacing the existing bridge with a prefabricated superstructure to improve freeboard and design capacity.
The project posed a number of challenges that included limited site access, poor ground conditions, highly compressible soils, and sensitive environmental habitat. We reviewed options for construction access and staging, including trail upgrades/ground improvements to support heavy equipment, installation with a heavy lift helicopter or accessing the site and installation using sectional barges. Helical piles with a cast-in-place pile cap was selected as the bridge foundation as the piles could be installed with relatively lightweight equipment with minimum impact and disturbance to the surrounding environment.
Client
Metro Vancouver
Project Highlights
300,000
visitors
A prefabricated aluminum truss superstructure was selected to minimize overall weight and allow flexibility for the installation method chosen by the contractor. The successful contractor eventually selected to install the prefabricated bridge using a heavy lift helicopter. We provided services during construction that included environmental auditing of the contractor’s EMP, reviewing contractor submittals and daily construction inspection sheets to ensure compliance with the design and specifications.
More Transportation Projects
See all projects
Infrastructure
Chippewas of Nawash First Nation – Roads and Culvert Flood Damage Repair
Transportation
Outlook Truss Bridge Assessment
Transportation
Overlea Blvd. Bridge Rehabilitation
Transportation
Shell Canterra Road
Airports
Vancouver International Airport Parallel Runway
Infrastructure
Johnston Canyon Campground Upgrades
Transportation
184 Street and Yellowhead Trail Interchange
Bridges
Seymour Canyon Suspension Bridge
Transportation
LNG Canada Heavy Haul Bridges
Transportation
Highway 7 Haney Bypass Intersection Improvements
Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit
Infrastructure
Baxter Bridge Rehabilitation
Transportation
Bobtail Forest Service Road Overpass
Infrastructure
Highway 69 Twinning
Transportation
Saline Creek Drive Pedestrian Bridge
LEADERSHIP INSIGHTS
See all insights