Location
Vernon, British Columbia
Expertise
Environmental
Contaminated Sites Management
Share
Associated Environmental was initially engaged in 2006 to conduct Stage 1 and 2 Preliminary Site Investigations (PSIs) and a Limited Detailed Site Investigation (LDSI) at the Hilltop Subaru in Vernon, BC.
The study generally followed the protocols and guidelines outlined in the BC Contaminated Sites Regulation (CSR) of the Environmental Management Act.
The Stage 1 PSI qualitatively assessed the likelihood that soil or groundwater contamination existed at the site, and the Stage 2 PSI confirmed the presence of potential contaminants of concern associated with areas of potential environmental concern (APECs) identified during the Stage 1 PSI. An LDSI was undertaken to delineate the contamination identified in the Stage 2 PSI, characterize the contamination and contaminant/groundwater flow patterns.
Project Highlights
The results of the PSI and LDSI findings indicated that soil and groundwater beneath the Subject Site was contaminated to levels exceeding the Provincial Commercial Land Use (CL) soil standard, and Aquatic Life (AW) and Drinking Water (DW) standards in groundwater. We concluded that the Subject Site was contaminated, and that it was highly likely that the contamination had migrated from neighbouring properties. Since 2006, Associated has conducted follow-up groundwater monitoring at the site, as well as additional subsurface investigations at neighbouring properties to further characterize the contamination and assist with ongoing remediation efforts.
More Environmental Projects
See all projects
Contaminated Sites Management
North Okanagan Child Care Society Phase I Environmental Site Assessment
Environmental
Contamination Management, Valley Line LRT
Environmental
Kelowna Airport Soil Salvage and Enhancement Strategy
Buildings
Corix Biomass Energy Centre
Containment Systems
Silverberry Secure Landfill
Environmental
Environmental Assessments, Southeast BC
Transportation
Highway 7 Haney Bypass Intersection Improvements
Soil Bioengineering
Blackmud Creek Erosion Feasibility Study and Design
Environmental
John Matthews Creek Ravine Management Strategy and Creek Restoration
Fish, Wildlife & Ecosystems
Regional Wildlife Monitoring Plan
Environmental
Growth and Economic Development Strategy
Environmental
Francis Cooke Landfill Operations Plan
Environmental
Phase II Environmental Assessment for 5 Year Permit to Operate, Lumsden Landfill
Environmental
Sicamous to Armstrong Rail Trail Agricultural Component
Environmental Assessment
Highland Valley Copper Mine, Environmental Impact Assessment
LEADERSHIP INSIGHTS
See all insights