Location
Vernon, British Columbia
Expertise
Environmental
Contaminated Sites Management
Share
Associated Environmental was initially engaged in 2006 to conduct Stage 1 and 2 Preliminary Site Investigations (PSIs) and a Limited Detailed Site Investigation (LDSI) at the Hilltop Subaru in Vernon, BC.
The study generally followed the protocols and guidelines outlined in the BC Contaminated Sites Regulation (CSR) of the Environmental Management Act.
The Stage 1 PSI qualitatively assessed the likelihood that soil or groundwater contamination existed at the site, and the Stage 2 PSI confirmed the presence of potential contaminants of concern associated with areas of potential environmental concern (APECs) identified during the Stage 1 PSI. An LDSI was undertaken to delineate the contamination identified in the Stage 2 PSI, characterize the contamination and contaminant/groundwater flow patterns.


Project Highlights
The results of the PSI and LDSI findings indicated that soil and groundwater beneath the Subject Site was contaminated to levels exceeding the Provincial Commercial Land Use (CL) soil standard, and Aquatic Life (AW) and Drinking Water (DW) standards in groundwater. We concluded that the Subject Site was contaminated, and that it was highly likely that the contamination had migrated from neighbouring properties. Since 2006, Associated has conducted follow-up groundwater monitoring at the site, as well as additional subsurface investigations at neighbouring properties to further characterize the contamination and assist with ongoing remediation efforts.
More Environmental Projects
See all projects

Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound

Contaminated Sites Management
Quinto Mine Preliminary and Detailed Site Investigations

Environmental
Phase II Environmental Site Assessment, Historical Downtown Whitehorse

Water
Pitt River Inter-Tidal Habitat

Environmental
Sicamous to Armstrong Rail Trail Agricultural Component

Active Transportation
Whitemud Creek Boardwalk Replacement – Environmental Assessments

Environmental Assessment
Highland Valley Copper Mine, Environmental Impact Assessment

Environmental
Big Bend Master Drainage Plan

Environmental
Deh Cho Bridge, Environmental Services

Environmental
Great Slave Lake Nutrient Risk Assessment and Treatment Improvement Options Study Fiddlers Lagoon Wastewater Treatment

Environmental
Splatsin Eagle River Compensation Site Identification Site

Environmental Assessment
Environmental Assessment of Westside Road

Environmental
Community-Based Monitoring Software Project

Environmental
Tlichǫ Cultural Commons Digital Database

Contaminated Sites Management
Phase I and II Environmental Site Assessment – Margaret’s Landing Development
LEADERSHIP INSIGHTS
See all insights