Location
Burnaby, British Columbia
Expertise
Transit
Bridges
Structures
Transportation
Share
Part of the Initial System of the Vancouver Advanced Light Rail Transit project, subsequently the Vancouver SkyTrain, required a grade-separated crossing of a planned extension of 10th Avenue in South Burnaby. Geometric constraints required the four-lane roadway to pass underneath the three guideway tracks. A major constraint to the crossing design was the presence of the BC Southern Railway immediately to the south of the guideway tracks.
Faced with the costly prospect of building a complete bridge to accommodate the future roadway without affecting the adjacent railway track, the Initial System supplier, Metro Canada Limited, asked Associated Engineering, to provide an effective solution. The result was a unique structure that permitted uninterrupted use of the guideways during future roadway construction, did not impact the BC Southern Railway, and was substantially less expensive than a new bridge. The solution was piled slab construction in which shallow bank seat abutments and drilled piles were installed beneath the guideway alignments, and a 50 metre long, 600 millimetre deep concrete slab was cast on grade. Track slabs were cast on top of the slab to carry the ALRT tracks.
A decade later, the City of Burnaby retained Associated Engineering to design the new roadway, now named South Point Drive. The design called for excavation beneath the concrete slab and cladding of the piles to form new bridge piers. Now disused, the BC Southern Railway property was purchased and a pedestrian bridge built alongside to carry the BC Parkway recreational trail. SkyTrain operations were unaffected throughout this second phase of construction.
Project Highlights
More Transit Projects
See all projects
Bridges
SkyTrain Grandview Cut Structural Upgrade
Transit
Calgary Green Line LRT
Intelligent Transportation Systems
Red Deer Transit – Intelligent Transportation Systems (ITS) Project Charters
Transportation
Medicine Hat Transit ITS Decision Support
Building Mechanical
St. Albert Naki Transit Centre and Park & Ride
Transit
SkyTrain Fraser River Crossing North Approach Spans
Transportation
Regulatory Application and Approvals, Valley Line LRT
Environmental
Contamination Management, Valley Line LRT
Transportation
St. Albert Transportation Master Plan
Transportation
Edmonton Valley Line – Stage 1
Building Structures
Oliver Bowen Light Rail Vehicle Storage and Maintenance Facility
Environmental
Environmental Planning, Valley Line LRT
Transit
Broadway Subway
LEADERSHIP INSIGHTS
See all insights