Location
Kelowna, British Columbia
Expertise
Pump Stations
Buildings
Electrical Instrumentation & Controls
Building Structures
Building Mechanical
Water
Water Resources
Urban Drainage
Share
The city wanted to bring the electrical and mechanical control rooms above ground. The project required AE to strengthen the existing concrete substructure to allow construction of a new above-ground building. Associated’d multi-discipline team then designed a new structure, including the building mechanical, structural, and electrical engineering components, to house the pump station’s control rooms.
Client
City of Kelowna
Project Highlights
More Pump Stations Projects
See all projects
Infrastructure
Forest Lawn Lift Station
Pump Stations
Barnston/Maple Ridge Pump Station
Building Mechanical
Craigflower Pump Station
Buildings
Riel Recreation Park Redevelopment
Pump Stations
Homer Watson Pump Station Upgrade
Environmental Engineering
Regina Hauled Waste Receiving Station
Electrical Instrumentation & Controls
La Ronge and Air Ronge Municipal Utilities Back-Up Power
Building Structures
Columbia Street Pump Station
Pump Stations
Horseshoe Slough Drainage Pump Station
Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment
Infrastructure
Raw Water Supply – Pipeline River Crossing
Electrical Instrumentation & Controls
Solar Photovoltaic System Installation – WTP and Pumphouse
Pump Stations
Avenue H Reservoir and Pump Station
Water
Welland Water Treatment Plant
Computational Fluid Dynamics Analysis