Location
Kelowna, British Columbia
Expertise
Pump Stations
Buildings
Electrical Instrumentation & Controls
Building Structures
Building Mechanical
Water
Water Resources
Urban Drainage
Share
The city wanted to bring the electrical and mechanical control rooms above ground. The project required AE to strengthen the existing concrete substructure to allow construction of a new above-ground building. Associated’d multi-discipline team then designed a new structure, including the building mechanical, structural, and electrical engineering components, to house the pump station’s control rooms.
Client
City of Kelowna
Project Highlights
More Pump Stations Projects
See all projects
Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment
Energy
Process Energy Audits
Infrastructure
Forest Lawn Lift Station
Building Structures
Columbia Street Pump Station
Building Mechanical
Scott Street Sewage Pumping Station Upgrades
Pump Stations
Oakville Water Purification Plant
Building Mechanical
Craigflower Pump Station
Computational Fluid Dynamics Analysis
City of Saskatoon Reservoir and Pump Station Upgrades – CFD modelling
Pump Stations
Barnston/Maple Ridge Pump Station
Computational Fluid Dynamics Analysis
Saskatoon Raw Water Intake & Pump Station
Pump Stations
Horseshoe Slough Drainage Pump Station
Infrastructure
Oakville Fourth Line Closed Landfill
Environmental Engineering
Regina Hauled Waste Receiving Station
Pump Stations
Faulkner Lift Station
Electrical Instrumentation & Controls