Location
Kelowna, British Columbia
Expertise
Pump Stations
Buildings
Electrical Instrumentation & Controls
Building Structures
Building Mechanical
Water
Water Resources
Urban Drainage
Share
The city wanted to bring the electrical and mechanical control rooms above ground. The project required AE to strengthen the existing concrete substructure to allow construction of a new above-ground building. Associated’d multi-discipline team then designed a new structure, including the building mechanical, structural, and electrical engineering components, to house the pump station’s control rooms.

Client
City of Kelowna

Project Highlights
More Pump Stations Projects
See all projects

Pump Stations
Horseshoe Slough Drainage Pump Station

Pump Stations
Homer Watson Pump Station Upgrade

Building Structures
Columbia Street Pump Station

Pump Stations
Avenue H Reservoir and Pump Station

Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment

Infrastructure
Oakville Fourth Line Closed Landfill

Water
Welland Water Treatment Plant

Buildings
Riel Recreation Park Redevelopment

Building Mechanical
Arbutus Water Treatment Plant

Electrical Instrumentation & Controls
La Ronge and Air Ronge Municipal Utilities Back-Up Power

Building Mechanical
Scott Street Sewage Pumping Station Upgrades

Electrical Instrumentation & Controls
Solar Photovoltaic System Installation – WTP and Pumphouse

Computational Fluid Dynamics Analysis
Saskatoon Raw Water Intake & Pump Station

Pump Stations
Faulkner Lift Station

Energy