Location
Outlook, Saskatchewan
Expertise
Infrastructure
Irrigation
Water Supply, Storage, & Distribution
Share
The Water Security Agency engaged Associated Engineering to prepare a design and tender package for the required upgrades to the first 3.2 kilometres of canal in the Saskatoon South East Water Supply System, immediately east of the Broderick Reservoir.
The rehabilitation design of the canal was completed using a fast-tracked, modified progressive delivery approach, in collaboration with Agenct representatives, to meet the extremely short timeline from design initiation to tender ready. The design includes a capacity upgrade of approximately 30% to 8.2 cubic metres per second, incorporation of a geotextile liner and rock armour, turn-out, cross drain, and drain inlet replacements, and modifications to check structures.
Project Highlights
More Infrastructure Projects
See all projects
Water
Fort Chipewyan Water Treatment Plant Expansion
Infrastructure
Churchill Airport Runway Upgrades
Transportation
Bellevue Creek Bridge
Transportation
Cold Lake CRISP
Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit
Transportation
Canmore Bridge Management
Streetscaping
Nigel Valley Public Spaces
Infrastructure
Heavy Rainfall Event Disaster Recovery
Energy
New Central Library Direct Energy Service Connection and Energy Transfer Station
Strategic Advisory Services
Peterborough Streetlight Condition Assessment
Infrastructure
West Calgary Storm Sewer Relief
Infrastructure
Irrigation System Strategy
Infrastructure
Medicine Hat Sidewalk Inventory and Asset Management Program
Infrastructure
Minnedosa Community Housing
Environmental
37 Street SW Storm Trunk Relocation
LEADERSHIP INSIGHTS
See all insights