Saskatoon South East Water Supply System Canal Rehabilitation

Location

Outlook, Saskatchewan

Expertise

Infrastructure

Irrigation

Water Supply, Storage, & Distribution

The Water Security Agency engaged Associated Engineering to prepare a design and tender package for the required upgrades to the first 3.2 kilometres of canal in the Saskatoon South East Water Supply System, immediately east of the Broderick Reservoir.

The rehabilitation design of the canal was completed using a fast-tracked, modified progressive delivery approach, in collaboration with Agenct representatives, to meet the extremely short timeline from design initiation to tender ready. The design includes a capacity upgrade of approximately 30% to 8.2 cubic metres per second, incorporation of a geotextile liner and rock armour, turn-out, cross drain, and drain inlet replacements, and modifications to check structures.

Map Image
Blue Section

Project Highlights

LEADERSHIP INSIGHTS

See all insights

Green Section

Careers

A career step in the right direction

We are recognized as one of Canada’s Best Managed Companies for 14 consecutive years but our achievements and reputation are only possible because of our amazing staff. We believe that a supported staff allows them to excel at what they do best, and provide the best possible service to our clients and communities.