Location
Outlook, Saskatchewan
Expertise
Infrastructure
Irrigation
Water Supply, Storage, & Distribution
Share
The Water Security Agency engaged Associated Engineering to prepare a design and tender package for the required upgrades to the first 3.2 kilometres of canal in the Saskatoon South East Water Supply System, immediately east of the Broderick Reservoir.
The rehabilitation design of the canal was completed using a fast-tracked, modified progressive delivery approach, in collaboration with Agenct representatives, to meet the extremely short timeline from design initiation to tender ready. The design includes a capacity upgrade of approximately 30% to 8.2 cubic metres per second, incorporation of a geotextile liner and rock armour, turn-out, cross drain, and drain inlet replacements, and modifications to check structures.
Project Highlights
More Infrastructure Projects
See all projects
Streetscaping
Nigel Valley Public Spaces
Transportation
Overlea Blvd. Bridge Rehabilitation
Buildings
North Wall Sewage Treatment Plant and Main Lift Station Upgrade
Transportation
Broadway Street Improvements
Infrastructure
Kluskus Village Domestic Water System Improvements
Infrastructure
Wildfire Infrastructure Rehabilitation Program
Environmental
Growth and Economic Development Strategy
Transportation
Bellevue Creek Bridge
Containment Systems
Cell 3 East Halton Waste Management Site
Environmental
Sicamous to Armstrong Rail Trail Agricultural Component
Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment
Infrastructure
Chippewas of Nawash First Nation – Roads and Culvert Flood Damage Repair
Land Development
Blackwolf Community Development
Infrastructure
Fort Chipewyan Little Lake Residential Expansion
Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services
LEADERSHIP INSIGHTS
See all insights