Location
Outlook, Saskatchewan
Expertise
Infrastructure
Irrigation
Water Supply, Storage, & Distribution
Share
The Water Security Agency engaged Associated Engineering to prepare a design and tender package for the required upgrades to the first 3.2 kilometres of canal in the Saskatoon South East Water Supply System, immediately east of the Broderick Reservoir.
The rehabilitation design of the canal was completed using a fast-tracked, modified progressive delivery approach, in collaboration with Agenct representatives, to meet the extremely short timeline from design initiation to tender ready. The design includes a capacity upgrade of approximately 30% to 8.2 cubic metres per second, incorporation of a geotextile liner and rock armour, turn-out, cross drain, and drain inlet replacements, and modifications to check structures.


Project Highlights
More Infrastructure Projects
See all projects

Water
Fort Chipewyan Water Treatment Plant Expansion

Infrastructure
Provincial Disaster Assistance Program

Transportation
Haisla Bridge Replacement

Transit
SkyTrain Fraser River Crossing North Approach Spans

Infrastructure
Tłı̨chǫ All-Season Road – Financial Advisory Services

Energy
New Central Library Direct Energy Service Connection and Energy Transfer Station

Transportation
184 Street and Yellowhead Trail Interchange

Environmental
Sicamous to Armstrong Rail Trail Agricultural Component

Land Development
Royal Bay Subdivision

Transportation
Glenmore Dam Utility Relocation

Transportation
Sutherland Ave Pedestrian Bridge

Transportation
Highway 17 at County Road 508 Interchange

Environmental
Growth and Economic Development Strategy

Pedestrian Bridges
Dayton Street Pedestrian and Cycling Overpass

Energy
District Energy – Blatchford Redevelopment
LEADERSHIP INSIGHTS
See all insights