In recent years, Tachet has experienced water ingress and severe mould problems in a number of houses.
Issues were attributed to poor drainage, which allowed stormwater to flow uncontrollably into many homes. The community needed to develop a comprehensive drainage plan and identify a solution to move water away from affected homes. The community also required road improvements, such as roadside drainage ditches, driveway culverts, and roadway culverts, and wanted to correct the poor drainage caused by the deterioration of the gravel road surface. Lake Babine Nation retained Associated Engineering to complete a comprehensive drainage plan and identify improvements.

Client
Lake Babine Nation

Project Highlights
The existing community drainage system was limited to a single 450 millimetre diameter culvert. The remaining drainage consisted of uncontrolled overland flow routes along the road surfaces and through residential lots and natural areas. The drainage system left the community susceptible to uncontrolled stormwater flow on roadways, driveways, and residential lots; erosion and flooding of roadways and natural surfaces; and potential sediment concerns to receiving watercourses. Following the development of the drainage plan, Lake Babine Nation engaged Associated Engineering to complete the preliminary and detailed design and oversee construction of the community’s drainage and roadway improvements.
People on this project
More Infrastructure Projects
See all projects

Land Use & Community Planning
Glory Hills Area Structure Plan

Infrastructure
Pelican Lake First Nation Water Treatment Plant Expansion

Infrastructure
East Brampton Trunk Sanitary Sewer Twinning

Environmental
Climate Change Risk Assessment

Streetscaping
Nigel Valley Public Spaces

Environmental
Splatsin Eagle River Compensation Site Identification Site

Transportation
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design

Environmental
Sicamous to Armstrong Rail Trail Agricultural Component

Infrastructure
Johnston Canyon Campground Upgrades

Infrastructure
Fort Chipewyan Little Lake Residential Expansion

Infrastructure
Calgary Northwest Inner City Drainage Study

Infrastructure
Pelham Patrol Yard Fuel Tank Replacement

Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit

Infrastructure
Medicine Hat Sidewalk Inventory and Asset Management Program

Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study
LEADERSHIP INSIGHTS
See all insights