Location
Fort McMurray, Alberta
Expertise
Environmental
Environmental Planning
Share
Associated Environmental was retained by CEMA’s Terrestrial Subgroup (TSG) to assist with revisions to their Guidelines for Reclamation to Forest Vegetation in the Athabasca Oil Sands Region, referred to as the Revegetation Manual (2nd Edition).
Associated engaged oil sands mine reclamation planners, practitioners, contractors, and other stakeholders for their input to the planned revisions. We planned, hosted, facilitated, and summarized two stakeholder work sessions and an on-line survey to identify information gaps in the manual.
The work sessions engaged industrial stakeholders, Aboriginal groups, regulatory agencies, and consultants working in the oil sands region to understand how these groups use the manual and to receive input regarding possible enhancements to the manual. Associated partnered with a reclamation and oil sands expert to provide a focussed dialogue and deliver a well-informed product.
Project Highlights
The next steps were to develop, refine, and integrate an approved conceptual flow diagram into the manual, with a re-focus of developing revegetation techniques to establish upland forest ecosystems with multiple end land uses (i.e., commercial forest, wildlife habitat, traditional use, and recreation). This diagram was fundamental in guiding users of the manual in initial reclamation planning and application of vegetation establishment guidelines.
Associated developed checklists as a reclamation planning tool at the site level, which could be used at the landform and landscape level to identify design elements that would achieve end land-use goals. With the TSG as the final decision maker, the project was an iterative process at every step.
More Environmental Projects
See all projects
Environmental
Sicamous to Armstrong Rail Trail Agricultural Component
Environmental
Environmental Screening, Clearance Reporting and Post-Reclamation Construction Monitoring on Line 21
Water
Pitt River Inter-Tidal Habitat
Contaminated Sites Management
Quinto Mine Preliminary and Detailed Site Investigations
Environmental
Growth and Economic Development Strategy
Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound
Transportation
Highway 7 Haney Bypass Intersection Improvements
Environmental Assessment
Highland Valley Copper Mine, Environmental Impact Assessment
Environmental Assessment
Liquid Waste Management Plan Environmental Impact Study
Environmental
Contamination Management, Valley Line LRT
Environmental
Stage 1 & 2 Preliminary Site Investigations and Limited Detailed Site Investigation
Contaminated Sites Management
Sioux Lookout Phase I Environmental Site Assessment
Environmental
Great Slave Lake Nutrient Risk Assessment and Treatment Improvement Options Study Fiddlers Lagoon Wastewater Treatment
Environmental
Drinking Water System Improvements in Quaaout Community
Environmental
Community Lands Engagement Study & Environmental Site Assessment
LEADERSHIP INSIGHTS
See all insights