Location
Edmonton, Alberta
Expertise
Transportation
Transportation Planning
Transit
Environmental
Regulatory Authorizations
Share
Associated is the environmental team for the Valley Line LRT project.
The alignment extends 13.1 kilometres from Mill Woods to downtown Edmonton, with a significant crossing over the North Saskatchewan River.
This is the largest P3 project undertaken by the City of Edmonton and is valued at $2.2 billion. As part of the design and construction team, Associated is responsible for all regulatory application and approvals from Federal, Provincial and Municipal agencies for the entire alignment. Associated also developed the project environmental compliance matrix for all environmental aspects of the project.
Client
City of Edmonton
Project Highlights
$2.2B
value
More Transportation Projects
See all projects
Transportation
Saline Creek Drive Pedestrian Bridge
Infrastructure
Chippewas of Nawash First Nation – Roads and Culvert Flood Damage Repair
Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services
Land Development
Royal Bay Subdivision
Airports
Calgary Airport Glycol Treatment Facility
Transportation
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design
Transportation
Granville Bridge Seismic Retrofit and Renewal
Transportation
Pioneer Pedestrian Bridge
Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit
Transportation
170th Street Pedestrian Bridge
Streetscaping
Vanalman Avenue Upgrades
Airports
Vancouver International Airport Parallel Runway
Infrastructure
Johnston Canyon Campground Upgrades
Pedestrian Bridges
Dayton Street Pedestrian and Cycling Overpass
Transportation
Bobtail Forest Service Road Overpass
LEADERSHIP INSIGHTS
See all insights