Associated is the environmental team for the Valley Line LRT project.
The alignment extends 13.1 kilometres from Mill Woods to downtown Edmonton, with a significant crossing over the North Saskatchewan River.
This is the largest P3 project undertaken by the City of Edmonton and is valued at $2.2 billion. As part of the design and construction team, Associated is responsible for all regulatory application and approvals from Federal, Provincial and Municipal agencies for the entire alignment. Associated also developed the project environmental compliance matrix for all environmental aspects of the project.

Client
City of Edmonton

Project Highlights
$2.2B
value
People on this project
More Transportation Projects
See all projects

Transportation
Cowichan Valley Trail Bridges Condition Inspection and Load Rating

Transportation
Coast Meridian Overpass

Transportation
Ice Engineering and Ice Safety at Milne Inlet

Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services

Pedestrian Bridges
Hangingstone River Pedestrian Bridge

Transportation
Edmonton Valley Line – Stage 1

Transportation
Sutherland Ave Pedestrian Bridge

Transportation
St. Andrews Lock and Dam Bridge Deck Replacement

Transportation
Northwest Territories ITS Program

Transportation
LNG Canada Heavy Haul Bridges

Transportation
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design

Transportation
Highway 7 Haney Bypass Intersection Improvements

Transportation
Pioneer Pedestrian Bridge

Transportation
Highway 17 at County Road 508 Interchange

Transportation
Outlook Truss Bridge Assessment
LEADERSHIP INSIGHTS
See all insights