Location
Red Deer, Alberta
Expertise
Irrigation
Water Treatment
Share
Increasing the capacity of the City of Red Deer’s Water Treatment Plant to meet potable water demands for decades to come required innovative thinking and the expertise to meet regulatory requirements and challenging worksite conditions.
Working in conjunction with the City, Associated Engineering and sub-consultants designed and installed a new a three-conduit bank intake to complement the existing mid-stream intake, as well as a new Screen Building featuring regulatory-compliant travelling screens to replace older screens. Total capacity of the intake system was tripled to 250 ML/d. Maintaining uninterrupted service was achieved through careful planning while following an aggressive construction schedule.
Project Highlights
More Irrigation Projects
See all projects
Infrastructure
Irrigation Sustainability and Water Balance Seepage Assessment Study
Infrastructure
Raw Water Supply – Pipeline River Crossing
Infrastructure
Irrigation System Strategy
Building Mechanical
Woodward WWTP Headworks Biofilter Upgrades
Computational Fluid Dynamics Analysis
Saskatoon Raw Water Intake & Pump Station
Infrastructure
Saskatoon South East Water Supply System Canal Rehabilitation
Irrigation
Kerry Park Sports Field Complex
Building Mechanical
Powell River WWTP
Strategic Advisory Services