Location
St. Albert, Alberta
Expertise
Transportation
Bridges
Pedestrian Bridges
Share
The City of St. Albert retained Associated Engineering and McElhanney, along with Thurber, ENC Testing, ACI, and Trace to complete the Ray Gibbon Drive improvements. These improvements were broken down into three phases (2, 3, and 4).
Associated Engineering’s scope of work included preliminary design of a rail bridge grade separation, a new pedestrian bridge, and a second bridge over the Sturgeon River. The bridge over the Sturgeon River was advance to detailed design and construction. In addition to the major work that included the design and construction services for the twinning of Ray Gibbon Drive over Sturgeon River, we also completed drainage, electrical and environmental scopes for the project.
Client
City of St. Albert
Project Highlights
$5.23M
Construction Value
2022
Completed
More Transportation Projects
See all projects
Transportation
Highway 16 SAFE Corridor
Transportation
Granville Bridge Seismic Retrofit and Renewal
Transportation
170th Street over CN Rail Bridge Rehabilitations
Transportation
Outlook Truss Bridge Assessment
Streetscaping
Nigel Valley Public Spaces
Transportation
7 Avenue S. Bike Boulevard
Transportation
Haisla Bridge Replacement
Transportation
Still Creek Pedestrian Bridge Replacement
Transportation
Highway 17 at County Road 508 Interchange
Transportation
Ice Engineering and Ice Safety at Milne Inlet
Transportation
170th Street Pedestrian Bridge
Infrastructure
Churchill Airport Runway Upgrades
Transportation
Cowichan Valley Trail Bridges Condition Inspection and Load Rating
Transportation
Calgary Airport Runway and Tunnel
Transportation
Coast Meridian Overpass
LEADERSHIP INSIGHTS
See all insights