Associated Engineering was part of the design-build team selected to replace the Pitt River Bridge in Port Coquitlam, BC.
The seven-lane, $200 million bridge project across the Pitt River replaced two aging swing bridges. The 506 metre long bridge features a 380 metre long three-span cable-stayed bridge which is integral with two approach spans at each end.
The project team developed an innovative and cost-effective bridge concept using an advanced cable-stayed design and highly efficient river foundations. Our design offers significant constructability benefits and operational advantages. With only one river pier the cable-stayed bridge reduced in-river construction works, disruption to navigation, and impact to the environment. The novel two-pylon bridge design replacement features three planes of cable stays.


Project Highlights
$200M
project
506M
Length
380M
three-span cable-stayed
To address the three-level performance-based seismic design criteria we carried out pushover analyses to assess seismic performance of the main pylons, approach pier and piles. 3D linear spectral and non-linear time history analyses were performed for demand verification and design checking, in addition to detailed wind and stay-cable loss studies.
Designed and constructed in a record 30 months, the new Pitt River Bridge was opened to traffic in November 2009.
People on this project
More Transportation Projects
See all projects

Infrastructure
Churchill Airport Runway Upgrades

Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit

Transportation
Kitsault Mine Access Road and Bridge Assessments

Transportation
Haisla Bridge Replacement

Active Transportation
Highway 1 at Mountain Highway Interchange

Transportation
Bobtail Forest Service Road Overpass

Transportation
Fourth Street Pedestrian Overpass

Transportation
Pedestrian Bridge 151 Rehabilitation

Transportation
Pioneer Pedestrian Bridge

Roads
Johnson-Mariner Way Connector

Transportation
184 Street and Yellowhead Trail Interchange

Transportation
Glenmore Dam Utility Relocation

Transportation
Inuvik Airport Runway 06-24 Extension and Airside Civil Infrastructure Improvements

Transportation
BC Earthquake Integrated Asset Management Plan

Transportation
Medicine Hat Transit ITS Decision Support
LEADERSHIP INSIGHTS
See all insights