Associated Engineering was part of the design-build team selected to replace the Pitt River Bridge in Port Coquitlam, BC.
The seven-lane, $200 million bridge project across the Pitt River replaced two aging swing bridges. The 506 metre long bridge features a 380 metre long three-span cable-stayed bridge which is integral with two approach spans at each end.
The project team developed an innovative and cost-effective bridge concept using an advanced cable-stayed design and highly efficient river foundations. Our design offers significant constructability benefits and operational advantages. With only one river pier the cable-stayed bridge reduced in-river construction works, disruption to navigation, and impact to the environment. The novel two-pylon bridge design replacement features three planes of cable stays.
Project Highlights
$200M
project
506M
Length
380M
three-span cable-stayed
To address the three-level performance-based seismic design criteria we carried out pushover analyses to assess seismic performance of the main pylons, approach pier and piles. 3D linear spectral and non-linear time history analyses were performed for demand verification and design checking, in addition to detailed wind and stay-cable loss studies.
Designed and constructed in a record 30 months, the new Pitt River Bridge was opened to traffic in November 2009.
People on this project
More Transportation Projects
See all projects
Transportation
Still Creek Pedestrian Bridge Replacement
Transportation
Vancouver International Airport Rainwater Harvesting
Transportation
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design
Infrastructure
Churchill Airport Runway Upgrades
Transportation
Medicine Hat Boardwalk Replacements
Transportation
Outlook Truss Bridge Assessment
Transportation
Kitsault Mine Access Road and Bridge Assessments
Transportation
Haisla Bridge Replacement
Transportation
John Hextall Bridge Rehabilitation
Airports
Vancouver International Airport Parallel Runway
Transportation
Little Smoky Bridge Inspection, Load Rating and Assessment
Transportation
Ice Engineering and Ice Safety for Tibbitt-Contwoyto Winter Road
Infrastructure
Highway 69 Twinning
Active Transportation
Highway 1 at Mountain Highway Interchange
Transportation
Ice Engineering and Ice Safety at Milne Inlet
LEADERSHIP INSIGHTS
See all insights