Associated Engineering was part of the design-build team selected to replace the Pitt River Bridge in Port Coquitlam, BC.
The seven-lane, $200 million bridge project across the Pitt River replaced two aging swing bridges. The 506 metre long bridge features a 380 metre long three-span cable-stayed bridge which is integral with two approach spans at each end.
The project team developed an innovative and cost-effective bridge concept using an advanced cable-stayed design and highly efficient river foundations. Our design offers significant constructability benefits and operational advantages. With only one river pier the cable-stayed bridge reduced in-river construction works, disruption to navigation, and impact to the environment. The novel two-pylon bridge design replacement features three planes of cable stays.


Project Highlights
$200M
project
506M
Length
380M
three-span cable-stayed
To address the three-level performance-based seismic design criteria we carried out pushover analyses to assess seismic performance of the main pylons, approach pier and piles. 3D linear spectral and non-linear time history analyses were performed for demand verification and design checking, in addition to detailed wind and stay-cable loss studies.
Designed and constructed in a record 30 months, the new Pitt River Bridge was opened to traffic in November 2009.
People on this project
More Transportation Projects
See all projects

Transportation
Inuvik Airport Runway 06-24 Extension and Airside Civil Infrastructure Improvements

Transportation
Granville Bridge Seismic Retrofit and Renewal

Transportation
Calgary Airport Runway and Tunnel

Transportation
Ice Engineering and Ice Safety at Milne Inlet

Transportation
Ice Engineering and Ice Safety for Tibbitt-Contwoyto Winter Road

Transportation
Kitsault Mine Access Road and Bridge Assessments

Transit
SkyTrain Fraser River Crossing North Approach Spans

Transportation
Transportation Planning and Functional Design of Burquitlam-Lougheed Neighbourhood Greenways

Transportation
Edmonton Valley Line – Stage 1

Transportation
Shell Canterra Road

Transportation
Haisla Bridge Replacement

Pedestrian Bridges
Hangingstone River Pedestrian Bridge

Transportation
Kapuskasing River Bridge

Transportation
Canmore Bridge Management

Transportation
Glenmore Dam Utility Relocation
LEADERSHIP INSIGHTS
See all insights