Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound
Location
Fort Providence, NWT
Expertise
Environmental
Bridges
Contaminated Sites Management
Environmental Assessment
Share
The Deh Cho Bridge was opened to traffic in 2012, thus ending the need for the Merv Hardie Ferry, north and south landings, and the Dory Point maintenance facility, southeast of Fort Providence, NT.
The Government of the Northwest Territories, Department of Transportation retained Associated Environmental to complete a Phase III Environmental Site Assessment and Remedial Action Plan Options Study.
The purpose of the Phase III ESA was to identify, delineate, and quantify environmental impacts on soil, surface water, groundwater and hazardous building materials at the sites. The Options Study provided alternatives based on the Phase III ESA findings, each of which reflect Class D Cost Estimates to remediate to Parkland (north and sound landing) and Industrial (maintenance facility) standards, including the benefits and disadvantages of each remediation option, and environmental effects from the remediation activities.
Project Highlights
Our knowledge and experience gained during construction of the Deh Cho Bridge helped us better scope the work, identify local contractors and develop a well thought out work plan that was received favourably by the Department. Following remediation, the Department will be developing the land into a viewpoint and picnic destination for travelers.
More Environmental Projects
See all projects
Soil Bioengineering
Blackmud Creek Erosion Feasibility Study and Design
Environmental
John Matthews Creek Ravine Management Strategy and Creek Restoration
Environmental Assessment
Environmental Assessment of Westside Road
Environmental Assessment
Highland Valley Copper Mine, Environmental Impact Assessment
Environmental
Data System Planning
Contaminated Sites Management
Sioux Lookout Phase I Environmental Site Assessment
Environmental
Francis Cooke Landfill Operations Plan
Environmental
Environmental Screening, Clearance Reporting and Post-Reclamation Construction Monitoring on Line 21
Environmental
Phase I and II Environmental Site Assessments and Compliance Audit Great Glacier Salmon Plant and Camp
Sustainable Management
Environmental Management System and Legislative Compliance Assessment
Environmental
Community-Based Monitoring Software Project
Environmental
Kelowna Airport Soil Salvage and Enhancement Strategy
Environmental
37 Street SW Storm Trunk Relocation
Environmental
Stage 1 & 2 Preliminary Site Investigations and Limited Detailed Site Investigation
Environmental
Great Slave Lake Nutrient Risk Assessment and Treatment Improvement Options Study Fiddlers Lagoon Wastewater Treatment
LEADERSHIP INSIGHTS
See all insights