Associated Environmental was engaged to do a Phase I and Phase II ESA in Kelowna, BC.
The studies were initiated for due diligence purposes associated with the potential development of the property. The assessments were carried out in a manner consistent with the methods outlined in the Canadian Standards Association (CSA Z768-00-R12 and Z769-00-R13). It also generally followed the protocols and guidelines for Stage 1 and 2 Preliminary Site Investigations outlined in the BC Contaminated Sites Regulation (CSR) of the Environmental Management Act.

Client
Margaret’s Landing Development

Project Highlights
The Phase I included 5 components consisting of records review, interviews, site inspection, evaluation of available information and reporting. The objective was to determine the risk of soil, soil vapour, and groundwater contamination at the site. The Phase I ESA identified one area of potential environmental concern, a gas station located directly adjacent to the Subject Site to the north and east.
Following this, a Phase II ESA was conducted to quantitatively determine the presence or absence of contamination and/or level of contamination in soil, vapour, and/or groundwater beneath the site. The results of the Phase II ESA indicated that potential contaminants of concern in all of the samples were below applicable standards.
More Contaminated Sites Management Projects
See all projects

Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound

Transportation
Highway 7 Haney Bypass Intersection Improvements

Environmental
Contamination Management, Valley Line LRT

Environmental
Stage 1 & 2 Preliminary Site Investigations and Limited Detailed Site Investigation

Environmental Assessment
Phase I Environmental Site Assessment

Containment Systems
Main Street Historical Landfill Excavation

Environmental
Phase I Environmental Site Assessment of 10 Housing Units

Contaminated Sites Management
Sioux Lookout Phase I Environmental Site Assessment

Contaminated Sites Management
Quinto Mine Preliminary and Detailed Site Investigations

Environmental
Phase II Environmental Site Assessment, Historical Downtown Whitehorse

Environmental
Phase I and II Environmental Site Assessments and Compliance Audit Great Glacier Salmon Plant and Camp

Environmental
Phase II Environmental Assessment for 5 Year Permit to Operate, Lumsden Landfill

Environmental
Francis Cooke Landfill Operations Plan

Building Mechanical
Hazardous Materials Survey and Abatement Monitoring of Buildings

Contaminated Sites Management
North Okanagan Child Care Society Phase I Environmental Site Assessment
LEADERSHIP INSIGHTS
See all insights