The City of Hamilton retained Associated Engineering to undertake an emergency repair of the 151 Pedestrian Bridge.
The original structure had been subjected to severe chloride damage as the pedestrian walkway is salted during the winter months. Upon investigation of the structure, we found the floor system particularly at the structure ends had reached end of life and posed an operational hazard to the structure.
Associated Engineering took specific measurements and undertook a detailed analysis of the structure and determined remedial work was required to maintain operation of the structure. The expedient repair was installed and allowed the structure to remain open until its scheduled replacement.


Project Highlights
More Transportation Projects
See all projects

Transportation
Kapuskasing River Bridge

Transportation
Haisla Bridge Replacement

Transportation
Casino Mine Access Road

Airports
Calgary Airport Glycol Treatment Facility

Transportation
Little Smoky Bridge Inspection, Load Rating and Assessment

Airports
Vancouver International Airport South Airfield Upgrades

Airports
Nanaimo Airport Airfield Electrical Upgrading

Transportation
Coast Meridian Overpass

Transportation
Transportation Planning and Functional Design of Burquitlam-Lougheed Neighbourhood Greenways

Transportation
Ice Engineering and Ice Safety at Milne Inlet

Transportation
Bellevue Creek Bridge

Transportation
Medicine Hat Transit ITS Decision Support

Transportation
Ice Engineering and Ice Safety for Tibbitt-Contwoyto Winter Road

Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services

Transportation
Sutherland Ave Pedestrian Bridge
LEADERSHIP INSIGHTS
See all insights