The City of Hamilton retained Associated Engineering to undertake an emergency repair of the 151 Pedestrian Bridge.
The original structure had been subjected to severe chloride damage as the pedestrian walkway is salted during the winter months. Upon investigation of the structure, we found the floor system particularly at the structure ends had reached end of life and posed an operational hazard to the structure.
Associated Engineering took specific measurements and undertook a detailed analysis of the structure and determined remedial work was required to maintain operation of the structure. The expedient repair was installed and allowed the structure to remain open until its scheduled replacement.
Project Highlights
More Transportation Projects
See all projects
Transportation
Little Smoky Bridge Inspection, Load Rating and Assessment
Transportation
John Hextall Bridge Rehabilitation
Airports
Vancouver International Airport South Airfield Upgrades
Transportation
Edmonton Valley Line – Stage 1
Transportation
Bobtail Forest Service Road Overpass
Bridges
Moody Street Overpass
Transportation
Ray Gibbon Drive Twinning
Pedestrian Bridges
Dayton Street Pedestrian and Cycling Overpass
Bridges
SkyTrain Grandview Cut Structural Upgrade
Infrastructure
Johnston Canyon Campground Upgrades
Transportation
Bermuda Runway Rehabilitation
Transportation
Medicine Hat Transit ITS Decision Support
Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services
Transportation
Inuvik Airport Runway 06-24 Extension and Airside Civil Infrastructure Improvements
Transportation
Vancouver International Airport Rainwater Harvesting
LEADERSHIP INSIGHTS
See all insights