Location
Calgary, Alberta
Expertise
Building Structures
Transit
Share
The City of Calgary identified the need for additional storage space for their newly acquired light rail vehicles.
These vehicles are planned to go into service on the new West leg of Calgary Transit’s Light Rapid Transit System in January 2013, a mission-critical deadline. Transportation Infrastructure, a division of The City of Calgary, selected Associated Engineering to act as Prime Consultant to a team providing architectural and engineering consulting services for the design and contract administration of the second phase of the Oliver Bowen Maintenance Facility.
Client
The City of Calgary
Project Highlights
5,330m2
additional building space
$10mil
capital cost
This Phase 2 extension provides approximately 5,330 square metres of additional building space on the east side of the existing building, and makes provision for construction of four additional rail tracks to provide storage and running repair maintenance for 48 light rail vehicles. With an estimated capital cost of $10 million, the structure was designed to conform to the LEED® (Leadership in Energy and Environmental Design) Silver Certification. The scope for this project included preliminary and detailed design, preparation of tender documents, and contract administration of the building, traction power, rail signals, and communications system, and review of track design for Calgary Transit construction.
Phase 2 project elements includes a storage building complete with electrical, mechanical, and lighting systems, security cameras, public address system, underground utilities, grounding and bonding of all project infrastructure, four new storage tracks to accommodate 48 light rail vehicles, eight track turn-outs, rail-switch heaters, a light rail overhead catenary system to feed power to vehicles, and a light rail power distribution system.
More Building Structures Projects
See all projects
Building Structures
Broadview Drive Commercial Development
Building Mechanical
Van Kam Freight Way Terminal
Building Mechanical
Hazardous Materials Survey and Abatement Monitoring
Buildings
Heron Hall
Infrastructure
Kikendaasogaming Elementary School Deficiency Repairs
Water
Fort Chipewyan Water Treatment Plant Expansion
Building Mechanical
Craigflower Pump Station
Building Mechanical
Oakmont Pump Station Upgrades
Infrastructure
Tsawwassen First Nation Sewage Treatment Plant
Buildings
Corix Biomass Energy Centre
Buildings
Riel Recreation Park Redevelopment
Buildings
Wood Innovation and Design Centre
Building Mechanical
Centennial Arena Expansion
Building Structures
Fort Hills Power System
Pump Stations
12th Avenue Drainage Pump Station
LEADERSHIP INSIGHTS
See all insights