The City of Calgary identified the need for additional storage space for their newly acquired light rail vehicles.
These vehicles are planned to go into service on the new West leg of Calgary Transit’s Light Rapid Transit System in January 2013, a mission-critical deadline. Transportation Infrastructure, a division of The City of Calgary, selected Associated Engineering to act as Prime Consultant to a team providing architectural and engineering consulting services for the design and contract administration of the second phase of the Oliver Bowen Maintenance Facility.

Client
The City of Calgary

Project Highlights
5,330m2
additional building space
$10mil
capital cost
This Phase 2 extension provides approximately 5,330 square metres of additional building space on the east side of the existing building, and makes provision for construction of four additional rail tracks to provide storage and running repair maintenance for 48 light rail vehicles. With an estimated capital cost of $10 million, the structure was designed to conform to the LEED® (Leadership in Energy and Environmental Design) Silver Certification. The scope for this project included preliminary and detailed design, preparation of tender documents, and contract administration of the building, traction power, rail signals, and communications system, and review of track design for Calgary Transit construction.
Phase 2 project elements includes a storage building complete with electrical, mechanical, and lighting systems, security cameras, public address system, underground utilities, grounding and bonding of all project infrastructure, four new storage tracks to accommodate 48 light rail vehicles, eight track turn-outs, rail-switch heaters, a light rail overhead catenary system to feed power to vehicles, and a light rail power distribution system.
More Building Structures Projects
See all projects

Building Mechanical
Hazardous Materials Survey and Abatement Monitoring

Building Mechanical
Centennial Arena Expansion

Infrastructure
Tsawwassen First Nation Sewage Treatment Plant

Buildings
Corix Biomass Energy Centre

Building Structures
Broadview Drive Commercial Development

Pump Stations
Skyline Pump Station

Building Mechanical
Hazardous Materials Survey and Abatement Monitoring of Buildings

Buildings
Manitoba Hydro – Keeyask Camp

Building Mechanical
Oakmont Pump Station Upgrades

Infrastructure
Kikendaasogaming Elementary School Deficiency Repairs

Building Structures
Columbia Street Pump Station

Buildings
Climate Change Risk Assessment for Buildings

Building Mechanical
Craigflower Pump Station

Infrastructure
Livestock and Forage Centre of Excellence

Water
Fort Chipewyan Water Treatment Plant Expansion
LEADERSHIP INSIGHTS
See all insights