Location
Oakville, Ontario
Expertise
Pump Stations
Sustainable Design
Water Treatment
Share
Situated on the waterfront overlooking Lake Ontario, the Oakville Water Purification Plant is nestled in an established and prominent neighbourhood, and delivers safe drinking water to residents of the Region of Halton.
The Region of Halton required major upgrades to the 100-year-old facility to replace aging infrastructure, address regulatory requirements, and meet future drinking water demands. Constrained by residences and the waterfront, space for expansion was limited. Associated Engineering employed a sustainable design approach, optimizing performance of unit processes and retrofitting or repurposing the facility’s existing infrastructure to increase capacity and improve treatment performance of the plant within the site footprint.
This approach limited disruption to the community and users of the waterfront trail. Careful planning and staging ensured drinking water supply to the community throughout the construction periods for each of the two phases of the upgrades, which began in 2005. Open communication kept residents informed and fostered a positive relationship.
Associated Engineering’s sustainable design approach provided cost efective improvements to the Oakville Water Purification Plant, delivering safe drinking water for the Region of Halton for many years to come. The project exemplifies how water utilities can defer large capital expenditures by maximizing value from their existing infrastructure assets.

Client
Region of Halton
Completion
2014
Awards
Consulting Engineers of Ontario, Award of Excellence

Project Highlights
$55M
Upgrade value
109
Capacity (ML/day)
4
Low lift pumps
2
Reservoir (ML)
More Pump Stations Projects
See all projects

Pump Stations
Faulkner Lift Station

Pump Stations
Horseshoe Slough Drainage Pump Station

Infrastructure
Forest Lawn Lift Station

Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment

Energy
Process Energy Audits

Building Mechanical
Scott Street Sewage Pumping Station Upgrades

Building Mechanical
Craigflower Pump Station

Computational Fluid Dynamics Analysis
City of Saskatoon Reservoir and Pump Station Upgrades – CFD modelling

Pump Stations
Barnston/Maple Ridge Pump Station

Electrical Instrumentation & Controls
Solar Photovoltaic System Installation – WTP and Pumphouse

Infrastructure
Oakville Fourth Line Closed Landfill

Electrical Instrumentation & Controls
La Ronge and Air Ronge Municipal Utilities Back-Up Power

Pump Stations
Skyline Pump Station

Pump Stations
Avenue H Reservoir and Pump Station

Building Mechanical