For over 20 years ending in 1982, the Oakville Fourth Line Landfill in the Regional Municipality of Halton received the town’s waste.
Subsequently, the Region constructed a new toe drain and leachate pump station to more effectively manage the accumulating leachate and protect the surrounding environment. The management strategy for handling the leachate included recirculating it at the landfill and hauling the leachate off-site by tanker truck for treatment.
To eliminate the need to haul and off-load approximately 40,000 to 55,000 cubic metres of leachate per year from the closed landfill facility, the Region engaged Associated Engineering to complete the preliminary and detailed design for a new submersible wet well leachate pump station and 100 millimetre force main (twinned for redundancy), connecting the station to the adjacent Neyagawa sanitary sewer.
Project Highlights
Choosing the force main routing and pump station design involved evaluating numerous factors. These included the presence and location of contaminated fill, unforeseen waste disposal areas, boulder, debris, and refuse within the working limits. In addition, consideration was given to the variable nature of the fill material, which would be controlled by selecting a less steep trench side slope or by providing lateral support to the trench walls. Special consideration was also given to the overriding environmentally sensitive areas and minimizing adverse effects on surrounding wildlife habitats.
We also provided contract administration and inspection services throughout construction.
More Infrastructure Projects
See all projects
Transit
SkyTrain Fraser River Crossing North Approach Spans
Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services
Airports
Christina Lake Infrastructure Upgrading
Infrastructure
Municipal Incentives to Attract Downtown Investment
Infrastructure
North Interceptor Sanitary Trunk
Hydrotechnical
Medicine Hat Flood Assistance
Water
Fort Chipewyan Water Treatment Plant Expansion
Infrastructure
Calgary Northwest Inner City Drainage Study
Environmental
Climate Change Risk Assessment
Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit
Land Development
Lethbridge Crossings Development
Bridges
SkyTrain Grandview Cut Structural Upgrade
Infrastructure
Mooney Forest Service Road
Transportation
Broadway Street Improvements
Transportation
Haisla Bridge Replacement
LEADERSHIP INSIGHTS
See all insights