Location
View Royal, British Columbia
Expertise
Building Mechanical
Building Structures
Pump Stations
Sustainable Design
Wastewater Collection & Storage
Share
Craigflower Pump Station is located west of Victoria, and serves Colwood, Langford, and View Royal. Associated Engineering completed option evaluation, conceptual design, detailed design, and provided construction services.
This architecturally pleasing and highly functional pump station features a self-cleaning trench style wet well, four 250 horsepower dry pit submersible pumps on variable frequency drives, and standby power generation.
Located near a residential neighbourhood, the pump station includes sound attenuation and a carbon media odour control unit. The design incorporates provisions for upgrading from Stage 1 flow requirements of 897 L/s to an ultimate capacity of 1991 L/s, as the service area continues to be developed.
Project Highlights
The pump station consists of a single-storey building (above-grade) with a significant below grade substructure. The below grade area, containing the wet well and pump room, extends below sea level and is located only a few metres from Portage Inlet. To deal with the challenging groundwater conditions and the constrained site, the station was constructed using a braced sheet pile retaining wall. The wet well is a compact self-cleaning trench-style configuration that can be divided into two areas using aluminum stop logs to safely permit operator entry, should maintenance be required.
In line with the Capital Regional District’s Regional Growth Strategy, the pump station includes sustainable design principles to provide the District with long-term value. A 1000 kW standby generator was included to ensure the station has back-up power in case of power failure. The standby generator provides enough power to operate three pumps and associated station loads. The fuel storage tanks provide 24 hours of storage at full load.
Due to the station’s close proximity to residences, the pump station systems were designed to comply with a night time maximum noise level of 40 dBA, except during power failure events, which requires the generator set to operate to provide backup power to the station.
People on this project
More Building Mechanical Projects
See all projects
Infrastructure
Rosehill Reservoir Rehabilitation
Buildings
Simon Fraser University Parcel 21
Building Mechanical
Elijah Smith School Energy Audit
Water
Jericho Reservoir
Building Mechanical
Scott Street Sewage Pumping Station Upgrades
Buildings
Misericordia Community Hospital Electrical Upgrades
Building Mechanical
Hazardous Materials Survey and Abatement Monitoring
Infrastructure
Kikendaasogaming Elementary School Deficiency Repairs
Infrastructure
Tsawwassen First Nation Sewage Treatment Plant
Building Mechanical
Eiling Kramer Campground Park Service Centre
Building Mechanical
Jim Pattison Centre of Excellence Building Technologies and Renewable Energy Conservation
Building Mechanical
Hazardous Materials Survey and Abatement Monitoring of Buildings
Buildings
North Wall Sewage Treatment Plant and Main Lift Station Upgrade
Water
Fort Chipewyan Water Treatment Plant Expansion
Building Mechanical
Martensville Athletic Pavillion
LEADERSHIP INSIGHTS
See all insights