Craigflower Pump Station is located west of Victoria, and serves Colwood, Langford, and View Royal. Associated Engineering completed option evaluation, conceptual design, detailed design, and provided construction services.
This architecturally pleasing and highly functional pump station features a self-cleaning trench style wet well, four 250 horsepower dry pit submersible pumps on variable frequency drives, and standby power generation.
Located near a residential neighbourhood, the pump station includes sound attenuation and a carbon media odour control unit. The design incorporates provisions for upgrading from Stage 1 flow requirements of 897 L/s to an ultimate capacity of 1991 L/s, as the service area continues to be developed.


Project Highlights
The pump station consists of a single-storey building (above-grade) with a significant below grade substructure. The below grade area, containing the wet well and pump room, extends below sea level and is located only a few metres from Portage Inlet. To deal with the challenging groundwater conditions and the constrained site, the station was constructed using a braced sheet pile retaining wall. The wet well is a compact self-cleaning trench-style configuration that can be divided into two areas using aluminum stop logs to safely permit operator entry, should maintenance be required.
In line with the Capital Regional District’s Regional Growth Strategy, the pump station includes sustainable design principles to provide the District with long-term value. A 1000 kW standby generator was included to ensure the station has back-up power in case of power failure. The standby generator provides enough power to operate three pumps and associated station loads. The fuel storage tanks provide 24 hours of storage at full load.
Due to the station’s close proximity to residences, the pump station systems were designed to comply with a night time maximum noise level of 40 dBA, except during power failure events, which requires the generator set to operate to provide backup power to the station.
People on this project
More Building Mechanical Projects
See all projects

Buildings
Misericordia Community Hospital Electrical Upgrades

Buildings
Climate Change Risk Assessment for Buildings

Infrastructure
Pelham Patrol Yard Fuel Tank Replacement

Building Mechanical
Van Kam Freight Way Terminal

Building Mechanical
Hazardous Materials Survey and Abatement Monitoring

Building Mechanical
Martensville Athletic Pavillion

Building Mechanical
Athabasca Regional Service Centre, Administration Building

Infrastructure
Rosehill Reservoir Rehabilitation

Water
Jericho Reservoir

Building Mechanical
Scott Street Sewage Pumping Station Upgrades

Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study

Building Mechanical
Residuals Treatment Facility

Building Mechanical
Eiling Kramer Campground Park Service Centre

Buildings
Chief Aranazhi School Upgrades

Building Mechanical
Woodward WWTP Headworks Biofilter Upgrades
LEADERSHIP INSIGHTS
See all insights