Location
Nelson, British Columbia
Expertise
Energy
Share
The City of Nelson retained Associated Engineering to complete a feasibility study for a District Energy System.
Two potential areas had been identified for assessment, the downtown Lakefront area and the Selkirk college campus. For each of the study areas, a building inventory and the estimated energy loads were summarized. Since all of the potential customer buildings were existing buildings, a high level assessment of the likely current heating system and the level of effort required to retrofit to a District Energy System was made.
Associated Engineering developed a model to analyze various combinations of connected buildings. The model compared the capital costs necessary to provide a central energy plant and to connect all the buildings with District Energy distribution piping against projected revenue from energy sales from those buildings. By repeating this analysis on various “nodes” of the system, the optimum first phase and subsequent phasing of the District Energy System could be determined.
Project Highlights
Three energy sources were considered for providing the base energy load to the District Energy System. These consisted of biomass boilers, lake sourced heat pumps and geoexchange sourced heat pumps. A delivered cost of energy analysis determined that biomass boilers provided the most cost-effective energy source. Associated Engineering provided a concept design for the first phase of District Energy System, supported by a cost estimate and business case analysis.
O&M costs, debt servicing, grant funding and energy sales revenues were projected over the project lifecycle in order to identify potential energy rate pricing and structure. This information together with greenhouse gas emissions reduction analysis allowed the City of Nelson to proceed to the next steps in their District Energy System implementation strategy.
More Energy Projects
See all projects
Energy
Sylvan Lake Instrumentation & Control Services
Energy
British Columbia Lottery Corporation Geoexchange Feasibility Study
Energy
District Energy – Blatchford Redevelopment
Energy
Surrey Civic Centre Plaza
Building Mechanical
Residuals Treatment Facility
Strategic Advisory Services
Lethbridge Energy Efficiency Master Plan and Strategy
Energy
Red Deer Wastewater Treatment Plant – PLC, Instrumentation and Controls Retrofit
Energy
New Central Library Direct Energy Service Connection and Energy Transfer Station
Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study
Electrical Instrumentation & Controls
Solar Photovoltaic System Installation – WTP and Pumphouse
Energy
Fort McMurray Wastewater Treatment Plant – Instrumentation, Controls & Automation
Energy
Gateway Theatre Wastewater Heat Recovery
Energy
Liquefied Natural Gas for Electrical Generation
Energy
Solar Feasibility Study for Medicine Hat Reservoirs
Energy