Location
Fort McMurray, Alberta
Expertise
Bridges
Share
Associated Engineering provided overall design, project management, hydrotechnical analysis, construction services and coordination of work with the Department of Fisheries and Oceans, Alberta Environment and utility owners.
The project comprised the design and construction of a river crossing bridge, which consisted of a 30 metre steel girder founded on driven steel pipe piles. The deck comprised 11 metre full width deck panels with a transverse reinforced joint.
With a compressed design time frame and construction window, we incorporated a number of the features used in BC resource sector to expedite construction of the bridge. These included the use of precast concrete deck panels to minimize the amount of cast-in-place concrete work and reduce the duration of construction. In addition to accommodating highway legal traffic, we designed the bridge to accommodate a number of overload vehicles thereby ensuring that the bridge had sufficient capacity to support the transportation of the heavy modules that are integral to the economical construction of the plant.
Project Highlights
More Bridges Projects
See all projects
Bridges
Knight Street Bridge Upgrading
Transportation
Don River Blvd. Bridge Rehabilitation
Transportation
Coast Meridian Overpass Detailed Inspection
Bridges
Battle Creek Road Bridge Replacement
Bridges
La Biche River Bridge – Highway 63
Active Transportation
Highway 1 at Mountain Highway Interchange
Transportation
Overlea Blvd. Bridge Rehabilitation
Transportation
Little Smoky Bridge Inspection, Load Rating and Assessment
Bridges
Ross River Pedestrian Bridge Rehabilitation
Transportation
170th Street Pedestrian Bridge
Transportation
184 Street and Yellowhead Trail Interchange
Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit
Transportation
Kitsault Mine Access Road and Bridge Assessments
Transportation
Waterton National Park Trail Bridge Replacements
Bridges