Associated Engineering provided overall design, project management, hydrotechnical analysis, construction services and coordination of work with the Department of Fisheries and Oceans, Alberta Environment and utility owners.
The project comprised the design and construction of a river crossing bridge, which consisted of a 30 metre steel girder founded on driven steel pipe piles. The deck comprised 11 metre full width deck panels with a transverse reinforced joint.
With a compressed design time frame and construction window, we incorporated a number of the features used in BC resource sector to expedite construction of the bridge. These included the use of precast concrete deck panels to minimize the amount of cast-in-place concrete work and reduce the duration of construction. In addition to accommodating highway legal traffic, we designed the bridge to accommodate a number of overload vehicles thereby ensuring that the bridge had sufficient capacity to support the transportation of the heavy modules that are integral to the economical construction of the plant.
Project Highlights
More Bridges Projects
See all projects
Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit
Transportation
Duggan Bridge Replacement
Bridges
Stony Trail/Bow River Bridge Fog Detection System
Bridges
SkyTrain Grandview Cut Structural Upgrade
Bridges
Battle Creek Road Bridge Replacement
Environmental
Deh Cho Bridge, Environmental Services
Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound
Transportation
Granville Bridge Seismic Retrofit and Renewal
Bridges
Knight Street Bridge Upgrading
Bridges
Engineering services for Houston Forest Products
Transportation
Cowichan Valley Trail Bridges Condition Inspection and Load Rating
Bridges
West Main Street Bridge Restoration
Transportation
Don River Blvd. Bridge Rehabilitation
Bridges
Yoho Bridge Concrete Design
Transportation