Location
North Vancouver, British Columbia
Expertise
Infrastructure
Structures
Share
The Corporation of the City of North Vancouver and the Squamish Nation Reserve Lands Mission Reserve retained Associated Engineering’s multi‑disciplinary team to provide detailed design, construction documentation and engineering support during construction for the implementation of the 215-metre segment of the Spirit Trail – Mosquito Creek Marina project – a joint initiative between the City and the Squamish Nation.
Associated Engineering led a multi-disciplinary team to develop a suitable route and layout details of the Spirit Trail through the Marina waterfront, while considering the logistics of the public-private interfaces and the operational requirements of the marina boatlift structure.
Client
City of North Vancouver
Project Highlights
$5 million
Construction cost
People on this project
More Infrastructure Projects
See all projects
Environmental
Phase I Environmental Site Assessment of 10 Housing Units
Infrastructure
Minnedosa Community Housing
Infrastructure
Rosehill Reservoir Rehabilitation
Environmental
Community-Based Monitoring Software Project
Transit
SkyTrain Fraser River Crossing North Approach Spans
Infrastructure
Calgary Northwest Inner City Drainage Study
Infrastructure
Burnaby Lake Rowing Club Pavilion Floating Dock
Transportation
Vancouver International Airport Rainwater Harvesting
Buildings
Corix Biomass Energy Centre
Infrastructure
West Edmonton Sanitary Sewer Tunnel W12
Infrastructure
Kennedale Snow Storage Site Development
Strategic Advisory Services
Peterborough Streetlight Condition Assessment
Infrastructure
Market Crossing Commercial Development
Infrastructure
Century Park
Environmental
Splatsin Eagle River Compensation Site Identification Site
LEADERSHIP INSIGHTS
See all insights