Location
North Vancouver, British Columbia
Expertise
Infrastructure
Structures
Share
The Corporation of the City of North Vancouver and the Squamish Nation Reserve Lands Mission Reserve retained Associated Engineering’s multi‑disciplinary team to provide detailed design, construction documentation and engineering support during construction for the implementation of the 215-metre segment of the Spirit Trail – Mosquito Creek Marina project – a joint initiative between the City and the Squamish Nation.
Associated Engineering led a multi-disciplinary team to develop a suitable route and layout details of the Spirit Trail through the Marina waterfront, while considering the logistics of the public-private interfaces and the operational requirements of the marina boatlift structure.
Client
City of North Vancouver
Project Highlights
$5 million
Construction cost
People on this project
More Infrastructure Projects
See all projects
Environmental
Phase I Environmental Site Assessment of 10 Housing Units
Computational Fluid Dynamics Analysis
E.L. Smith Water Treatment Plant Upgrade
Infrastructure
Rosehill Reservoir Rehabilitation
Environmental
Tlichǫ Cultural Commons Digital Database
Environmental
37 Street SW Storm Trunk Relocation
Water
Jericho Reservoir
Infrastructure
Gold Bar Wastewater Treatment Plant
Infrastructure
Melville Water Treatment Plant
Infrastructure
Ice Engineering, Safety Services, and Road Management Plan
Infrastructure
Tłı̨chǫ All-Season Road – Financial Advisory Services
Infrastructure
Trestle No. 3 Rehabilitation and Steel Pipe Replacement
Environmental
Port of Vancouver – Climate Change Adaptation
Infrastructure
Oakville Fourth Line Closed Landfill
Transportation
Highway 17 at County Road 508 Interchange
Infrastructure
Medicine Hat Sidewalk Inventory and Asset Management Program
LEADERSHIP INSIGHTS
See all insights