Location
Medicine Hat, Alberta
Expertise
Transportation
Bridges
Bridge Asset Management & Inspection
Bridge Rehabilitation & Retrofit
Share
The City of Medicine Hat identified numerous trail bridges for replacement.
The bridges were in poor condition and did not satisfy current codes and standards for safety. As well, the City wanted to have structures that could transport their maintenance vehicles for regular trail repairs.
Client
City of Medicine Hat
Project Highlights
People on this project
More Transportation Projects
See all projects
Transit
SkyTrain Crossing of South Point Drive
Transportation
Transportation Planning and Functional Design of Burquitlam-Lougheed Neighbourhood Greenways
Transportation
Little Smoky Bridge Inspection, Load Rating and Assessment
Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection
Bridges
Seymour Canyon Suspension Bridge
Transportation
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design
Transportation
Shell Canterra Road
Transportation
Coast Meridian Overpass
Transit
SkyTrain Fraser River Crossing North Approach Spans
Transportation
Freegold Road Functional Plan
Bridges
Moody Street Overpass
Transportation
Sutherland Ave Pedestrian Bridge
Transportation
Ironworkers Memorial Second Narrows Bridge Fatigue Study
Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services
Transportation
Vancouver International Airport Rainwater Harvesting
LEADERSHIP INSIGHTS
See all insights