Associated Engineering was retained by the Okanagan Nation Alliance to design and construct 5 new overshot gates at the McIntyre Dam to allow traditional sockeye salmon passage to resume beyond the structure.
Since its original construction 95 years earlier, salmon and fish passage and migration stopped at this structure.
McIntyre Dam controls water levels in Vaseux Lake and Okanagan River flows between Vaseux and Osoyoos Lakes, as part of the Okanagan Lake Regulation System (OLRS). The OLRS is owned, operated and maintained by the BC Ministry of Environment (MOE) through its Water Stewardship Division in Penticton.
Client
Okanagan Nation Alliance
Project Highlights
More Environmental Projects
See all projects
Environmental Assessment
Highland Valley Copper Mine, Environmental Impact Assessment
Fish, Wildlife & Ecosystems
Regional Wildlife Monitoring Plan
Environmental Assessment
Liquid Waste Management Plan Environmental Impact Study
Soil Bioengineering
Blackmud Creek Erosion Feasibility Study and Design
Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound
Environmental
Growth and Economic Development Strategy
Environmental
South Cranberry Creek Hydroelectric Facility Long-Term Environmental Monitoring
Environmental
37 Street SW Storm Trunk Relocation
Environmental
Great Slave Lake Nutrient Risk Assessment and Treatment Improvement Options Study Fiddlers Lagoon Wastewater Treatment
Buildings
Corix Biomass Energy Centre
Environmental
Stage 1 & 2 Preliminary Site Investigations and Limited Detailed Site Investigation
Environmental Assessment
Environmental Assessment of Westside Road
Active Transportation
Whitemud Creek Boardwalk Replacement – Environmental Assessments
Environmental
Kelowna Airport Soil Salvage and Enhancement Strategy
Environmental
Phase II Environmental Assessment for 5 Year Permit to Operate, Lumsden Landfill
LEADERSHIP INSIGHTS
See all insights