Location
Burnaby, British Columbia
Expertise
Infrastructure
Roads
Streetscaping
Traffic Engineering
Urban Drainage
Share
The Byrne and Marine Commercial Development in Burnaby is one of Metro Vancouver’s largest food, drug, general merchandise and apparel retail anchored shopping centres.
Associated Engineering was responsible for the design of on-site and off-site infrastructure for the development of the 12 ha commercial development site. The off-site design included 330 m of roadworks, 460 m of sanitary sewer and force mains, 460 m of water mains and 460 m of storm sewer. The on-site storm sewer design included the use of pervious aquapavers for all parking areas (3 ha), providing 5,000 m3 of on-site detention within the underground detention pond created by the use of a railway ballast layer ranging between 300 mm and 700 mm in depth. The design required liaison with the developer, architect, landscape architect, geotechnical sub-consultant, mechanical sub-consultant and the City of Burnaby, Engineering and Environmental Departments.
Client
City of Burnaby
Project Highlights
12ha
development
330m
roadworks
460m
sanitary sewer
460m
water mains
460m
storm sewer
Associated Engineering was further responsible for preparing Tender Documents and Construction Drawings, and were the Contract Administrators for the on-site and off-site civil works.
The design reflects the Big Bend area’s unique ecosystem while creating a sustainable architectural setting.
More Infrastructure Projects
See all projects
Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study
Environmental Assessment
Fischer-Hallman Road Environmental Assessment
Airports
Inuvik Airport Runway Extension and Airside Civil Infrastructure Improvements
Transportation
Don River Blvd. Bridge Rehabilitation
Pedestrian Bridges
Dayton Street Pedestrian and Cycling Overpass
Infrastructure
Burnaby Lake Rowing Club Pavilion Floating Dock
Infrastructure
Calgary Northwest Inner City Drainage Study
Land Development
Lethbridge Crossings Development
Building Structures
Broadview Drive Commercial Development
Water
Fort Chipewyan Water Treatment Plant Expansion
Infrastructure
Medicine Hat Sidewalk Inventory and Asset Management Program
Transportation
Highway 17 at County Road 508 Interchange
Transportation
Glenmore Dam Utility Relocation
Energy
District Energy – Blatchford Redevelopment
Bridges
Engineering services for Houston Forest Products
LEADERSHIP INSIGHTS
See all insights