Location
Airdrie, Alberta
Expertise
Containment Systems
Contaminated Sites Management
Environmental Assessment
Environmental Engineering
Remediation and Reclamation
Share
The City of Airdrie retained Associated Environmental to complete environmental oversight and soil testing during the excavation of an unregistered historical landfill, located beneath the Main Street roadway.
The excavation was conducted to remove refuse from the historical landfill footprint and was completed in three stages.
For each stage, Associated was responsible for directing the disposal of refuse and contaminated soils, collecting confirmatory soil samples from the walls and base of the excavation, submitting soil samples to an analytical laboratory for analyses of potential contaminants, and comparing analytical results to Alberta Tier 1 Soil and Groundwater Remediation Guidelines.


Project Highlights
In total, the project team oversaw the removal of 5,431 cubic metres of refuse and contaminated soils from the historical landfill. Based on the results of the excavation sampling and supplemental drilling, and the previous environmental investigations completed by others, approximately 80% of the refuse has been removed from the historical landfill.
More Containment Systems Projects
See all projects

Infrastructure
Glenmore Landfill Entrance

Airports
Calgary Airport Glycol Treatment Facility

Infrastructure
Oakville Fourth Line Closed Landfill

Environmental
Phase II Environmental Assessment for 5 Year Permit to Operate, Lumsden Landfill

Infrastructure
Irrigation Sustainability and Water Balance Seepage Assessment Study

Containment Systems
Asquith Landfill Decomissioning

Containment Systems
Literature/Technology review services

Containment Systems
Cell 3 East Halton Waste Management Site

Climate Change Adaptation & Mitigation
Livingston Trail Environmental Control Facility

Infrastructure
Kennedale Snow Storage Site Development

Containment Systems
Brine Pond Construction

Containment Systems