Location
Kitimat, British Columbia
Expertise
Transportation
Bridges
Remote & Resource Bridges
Share
Associated Engineering, through our Alternate Delivery Company (Brybil), teamed with the Ledcor-Haisla Limited Partnership to design and construct three bridges on the new heavy haul road at the LNG Canada plant site near Kitimat, BC.
The three bridges were required to be designed to support heavy self-propelled modular transport (SMPT) vehicles, transporting heavy plant-site modules arriving by ships. The weight of the SMPT vehicles was up to 1,348 tonnes with 48 tonne axle loads.
Client
Ledcor Group
Project Highlights
The three structures designed and built included the Anderson Creek Bridge, Moore Creek Bridge, and the Beaver Creek Culvert.
People on this project
More Transportation Projects
See all projects
Transportation
Glenmore Dam Utility Relocation
Transportation
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design
Roads
Highway 91/91A Queensborough and Howes Interchanges
Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection
Transportation
Regulatory Application and Approvals, Valley Line LRT
Transportation
St. Albert Transportation Master Plan
Transportation
Saline Creek Drive Pedestrian Bridge
Streetscaping
Langford Cultural District
Airports
Nanaimo Airport Airfield Electrical Upgrading
Transportation
Still Creek Pedestrian Bridge Replacement
Airports
Vancouver International Airport Parallel Runway
Transportation
Don River Blvd. Bridge Rehabilitation
Infrastructure
Churchill Airport Runway Upgrades
Transportation
Calgary Airport Runway and Tunnel
Roads
Johnson-Mariner Way Connector
LEADERSHIP INSIGHTS
See all insights