Location
Sylvan Lake, Alberta
Expertise
Infrastructure
Transportation Planning
Urban Design
Share
Associated Engineering in partnership with EIDOS Consultants Incorporated (urban design) and Armin A. Preiksaitis & Associates (land use planning and economic development), was retained by the Town of Sylvan Lake to complete a conceptual design plan for the redevelopment of Lakeshore Drive between Wildrose Drive and 34 Street.
Associated provided transportation and municipal infrastructure services.
The ultimate goal of the Lakeshore Drive Redevelopment Project is to establish a legacy for Sylvan Lake that supports a vibrant, diverse, attractive and well-planned environment for both residents and visitors.
Project Highlights
Based on the analysis of existing conditions, guiding principles were formed to redevelop and realign Lakeshore Drive as a ‘Complete Street’, with an integrated roadway, promenade and open space system that promotes year-round pedestrian-oriented activity and movement; safety and security; barrier-free accessibility; a sustainable parking and shuttle bus system strategy; compatibility with existing and future land use; the preservation of the natural resources along the lakeshore; multi-modal use; gateway, node, and way-finding development; a healthy and active community lifestyle; a strong and authentic sense of place that celebrates the Town and regions history, culture and traditions; and an animated waterfront area with opportunities to shop, live, work, gather and do business.
More Infrastructure Projects
See all projects
Infrastructure
Market Crossing Commercial Development
Infrastructure
Ice Engineering, Safety Services, and Road Management Plan
Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services
Infrastructure
Baxter Bridge Rehabilitation
Energy
New Central Library Direct Energy Service Connection and Energy Transfer Station
Infrastructure
Century Park
Infrastructure
North Kildonan Feedermain
Environmental
Tlichǫ Cultural Commons Digital Database
Transportation
184 Street and Yellowhead Trail Interchange
Transportation
Cold Lake CRISP
Infrastructure
East Brampton Trunk Sanitary Sewer Twinning
Infrastructure
West Edmonton Sanitary Sewer Tunnel W12
Containment Systems
Cell 3 East Halton Waste Management Site
Strategic Advisory Services
East Side Pump Station Asset Management Plan
Infrastructure
Gitwinksihlkw Water Treatment Plant
LEADERSHIP INSIGHTS
See all insights