Location
Vancouver, British Columbia
Expertise
Bridges
Share
The Knight Street Bridge, opened to traffic in 19
The four-lane bridge includes two separate river crossings comprising elegant concrete spans of up to 110 m and a large number of concrete approach viaduct spans.
TransLink retained Associated Engineering as prime consultant to perform an independent seismic assessment of the bridge. A key objective of our study was to investigate higher levels of seismic demands and performance requirements than studied previously by the Ministry.
74, is one of the most important crossings of the Fraser River between Vancouver and Richmond.
The four-lane bridge includes two separate river crossings comprising elegant concrete spans of up to 110 m and a large number of concrete approach viaduct spans.
TransLink retained Associated Engineering as prime consultant to perform an independent seismic assessment of the bridge. A key objective of our study was to investigate higher levels of seismic demands and performance requirements than studied previously by the Ministry.

Client
TransLink

Project Highlights
Other key tasks included development of detailed, specific seismic performance and assessment criteria; development of site-specific seismic loading for seismic events having 500-year and 1000-year return periods; a detailed close-proximity condition survey of the entire bridge; non-destructive testing of the deck and post-tensioning tendons; development of preliminary and detailed designs for an overall seismic and condition upgrade of the bridge, bridge deck, foundations and liquefiable soils; and coordination of the proposed upgrades with safety upgrades being investigated for the crossing by others.
Two essential aspects of our retrofit and rehabilitation strategies were the integration of the seismic and rehabilitation works into a holistic, high value scheme, and the selection and design of the works to allow a safe, staged construction program with work to be completed without unacceptable impacts on the high traffic volumes that use this major transportation link.
More Bridges Projects
See all projects

Transportation
Medicine Hat Boardwalk Replacements

Transportation
Coast Meridian Overpass Detailed Inspection

Pedestrian Bridges
Dayton Street Pedestrian and Cycling Overpass

Bridges
Alexandra Bridge Deck Rehabilitation and Seismic Retrofit

Bridges
Sundance Crossings

Transportation
Fourth Street Pedestrian Overpass

Bridges
West Main Street Bridge Restoration

Bridges
La Biche River Bridge – Highway 63

Transportation
McKay River Bridge

Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound

Transportation
Canmore Bridge Management

Transportation
Overlea Blvd. Bridge Rehabilitation

Transportation
Whitemud Creek Oxbow Boardwalk

Bridges
Sucker River Bridge Replacement

Bridges