Location
Saskatoon, Saskatchewan
Expertise
Building Structures
Landscape Architecture
Parks & Recreation
Share
The PotashCorp Playland at Kinsmen Park was completed in 2015. The existing park was significantly renovated, with the addition of a large number of attractions.
Associated Engineering performed full structural engineering design, detailing and construction administration services on the train station structure, concession stand building, as well as the concrete piled foundations for the ferris wheel and carousel.
The train station is a highly architectural structure comprising an exposed cross-laminated timber roof supported on architectural concrete columns and cladded wood-framed “fin” walls. Complex yet discreet steel connections were required in order to support the long spans of the cross-laminated timber roof structure. There is a glazed clerestory, and the swing gates and sliding doors around the perimeter can be opened or closed depending on the season. The station canopy structure and the waiting platform are supported on a concrete piled foundation.


Project Highlights
People on this project
More Building Structures Projects
See all projects

Building Mechanical
Oakmont Pump Station Upgrades

Building Mechanical
Hazardous Materials Survey and Abatement Monitoring of Buildings

Buildings
Heron Hall

Pump Stations
Skyline Pump Station

Buildings
Wood Innovation and Design Centre

Pump Stations
Horseshoe Slough Drainage Pump Station

Water
Fort Chipewyan Water Treatment Plant Expansion

Buildings
Riel Recreation Park Redevelopment

Buildings
Stoney Nakoda Child & Family Services Building Assessment

Infrastructure
Kikendaasogaming Elementary School Deficiency Repairs

Pump Stations
12th Avenue Drainage Pump Station

Building Mechanical
Elijah Smith School Energy Audit

Building Mechanical
Hazardous Materials Survey and Abatement Monitoring

Building Mechanical
Craigflower Pump Station

Building Mechanical
Centennial Arena Expansion
LEADERSHIP INSIGHTS
See all insights