Location
Saskatoon, Saskatchewan
Expertise
Building Structures
Landscape Architecture
Parks & Recreation
Share
The PotashCorp Playland at Kinsmen Park was completed in 2015. The existing park was significantly renovated, with the addition of a large number of attractions.
Associated Engineering performed full structural engineering design, detailing and construction administration services on the train station structure, concession stand building, as well as the concrete piled foundations for the ferris wheel and carousel.
The train station is a highly architectural structure comprising an exposed cross-laminated timber roof supported on architectural concrete columns and cladded wood-framed “fin” walls. Complex yet discreet steel connections were required in order to support the long spans of the cross-laminated timber roof structure. There is a glazed clerestory, and the swing gates and sliding doors around the perimeter can be opened or closed depending on the season. The station canopy structure and the waiting platform are supported on a concrete piled foundation.
Project Highlights
People on this project
More Building Structures Projects
See all projects
Buildings
Simon Fraser University Parcel 21
Building Mechanical
Oakmont Pump Station Upgrades
Infrastructure
Tsawwassen First Nation Sewage Treatment Plant
Buildings
Manitoba Hydro – Keeyask Camp
Buildings
Heron Hall
Buildings
Riel Recreation Park Redevelopment
Building Mechanical
Van Kam Freight Way Terminal
Building Structures
Columbia Street Pump Station
Pump Stations
12th Avenue Drainage Pump Station
Building Structures
Broadview Drive Commercial Development
Building Structures
Elkford Community Centre
Infrastructure
Livestock and Forage Centre of Excellence
Infrastructure
Kikendaasogaming Elementary School Deficiency Repairs
Building Mechanical
Hazardous Materials Survey and Abatement Monitoring
Water Treatment
Russell Binscarth Water Treatment Plant
LEADERSHIP INSIGHTS
See all insights