Location
Niagara-on-the-Lake, Ontario
Expertise
Infrastructure
Irrigation
Share
With the extensive fruit and grape production that occurs in Niagara-on-the-Lake, providing adequate support to local farmers regarding irrigation has become critical to economic viability.
At present, the Town of Niagara-on-the-Lake operates an expansive irrigation system that is tied into the Municipal Drainage system. It draws water from the Niagara River, Ontario Power Generation hydro reservoir and the St. Lawrence Seaway Canal. The system does not currently provide enough water to meet the local demand throughout the growing season, resulting in the use of potable water for irrigation and in some instances potable water theft.
Irrigation is generally practiced from May 15 to September 15, with most greenhouses beginning April 1 and continuing into December. Most farmers irrigate only if there are two consecutive weeks without rain during this period. Tender fruit farmers generally apply 38-51 mm of water per irrigation set, and sometimes up to 100 mm of water. The amount of water being applied is measured using rain gauges and irrigation is continued until the desired water is collected by the gauge. In general, grape growers irrigate less than tender fruit farmers, requiring as low as 25 mm of water. However, when applying water under dry conditions, grape growers will require a higher rate and longer duration of irrigation, thus directly competing for water from tender fruit growers and putting signification strain on the water supply.


Project Highlights
The Town of Niagara-on-the-Lake retained the services of Associated Engineering to develop an Irrigation System Strategy. The strategy will be the first comprehensive irrigation plan for the Town and will serve as a first step toward improving customer levels of service, long-term growth and sustainability, and state of good repair of the Town’s irrigation system.
More Infrastructure Projects
See all projects

Infrastructure
Provincial Disaster Assistance Program

Buildings
Riel Recreation Park Redevelopment

Environmental
Port of Vancouver – Climate Change Adaptation

Hydrotechnical
Medicine Hat Flood Assistance

Transportation
Broadway Street Improvements

Water Treatment
Russell Binscarth Water Treatment Plant

Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study

Infrastructure
Irrigation Sustainability and Water Balance Seepage Assessment Study

Infrastructure
Clayton Reservoir

Airports
Christina Lake Infrastructure Upgrading

Environmental
Phase I Environmental Site Assessment of 10 Housing Units

Airports
Inuvik Airport Runway Extension and Airside Civil Infrastructure Improvements

Infrastructure
Saskatoon South East Water Supply System Canal Rehabilitation

Bridges
Engineering services for Houston Forest Products

Transportation
Don River Blvd. Bridge Rehabilitation
LEADERSHIP INSIGHTS
See all insights