Inuvik Airport Runway Extension and Airside Civil Infrastructure Improvements
Location
Inuvik, NWT
Expertise
Airports
Infrastructure
Share
The Government of the Northwest Territories retained Associated Engineering for the planning, detailed design, and construction oversight of the Runway 06-24 extension and airside civil infrastructure improvements at the Inuvik Mike Zubko Airport.
The airside runway, taxiway, and apron pavements are showing considerable surficial distress relating to permafrost degradation. Previous geotechnical studies have concluded the original permafrost regime beneath the airport surface structures has changed. The runway extension scope of work involves undertaking the planning, design and construction of the proposed Runway 06-24 extension to 2,743 metres.
The work includes the runway and strip, grading, drainage, granular base, pavement structure, relocation of NavCanada facilities, airfield electrical, pavement markings and aircraft turnarounds at each end of the runway. The scope importantly also includes undertaking climate change projections and developing climate design data inputs for the new runway taking future climate change into account.
Project Highlights
People on this project
More Airports Projects
See all projects
Airports
Vancouver International Airport South Airfield Upgrades
Transportation
Calgary Airport Runway and Tunnel
Transportation
Vancouver International Airport Rainwater Harvesting
Airports
Edmonton International Airport
Airports
Christina Lake Infrastructure Upgrading
Airports
Calgary Airport Trail Tunnel, Assessment and Permitting
Airports
Vancouver International Airport Parallel Runway
Airports
Calgary Airport Glycol Treatment Facility
Transportation
Inuvik Airport Runway 06-24 Extension and Airside Civil Infrastructure Improvements
Transportation
Bermuda Runway Rehabilitation
Airports