Location
Norman Wells, NWT
Expertise
Infrastructure
Share
The client undertook a large blasting and hauling operation as part of the infrastructure improvements supporting the Slater River Project.
NOR•EX Engineering provided safety services, ice engineering, and a road management plan for an ice crossing over the Mackenzie River, south of Norman Wells, Northwest Territories.
The client transported approximately 65-70 loads per day across the Mackenzie River, for close to 60 days, for an overall haul total of 130,000 tonnes. The program recorded zero ice related incidents during the season. The services provided improved efficiencies and cost savings for the client’s hauling program within a strong safety environment.

Client
NOR•EX Engineering

Project Highlights
65-70
transported loads per day
130,000t
for 60 days
More Infrastructure Projects
See all projects

Downtown and Main Street Revitalization
West Rossdale Redevelopment

Strategic Advisory Services
Peterborough Streetlight Condition Assessment

Energy
Site C Clean Energy

Infrastructure
Wildfire Infrastructure Rehabilitation Program

Climate Change Adaptation & Mitigation
Emergency Flood Damage Reduction Program

Environmental
Splatsin Eagle River Compensation Site Identification Site

Environmental
Port of Vancouver – Climate Change Adaptation

Transportation
184 Street and Yellowhead Trail Interchange

Land Development
Lethbridge Crossings Development

Strategic Advisory Services
East Side Pump Station Asset Management Plan

Streetscaping
Langford Cultural District

Environmental
Tlichǫ Cultural Commons Digital Database

Infrastructure
Highway 69 Twinning

Transportation
Broadway Street Improvements

Transportation
Haisla Bridge Replacement
LEADERSHIP INSIGHTS
See all insights