The client undertook a large blasting and hauling operation as part of the infrastructure improvements supporting the Slater River Project.
NOR•EX Engineering provided safety services, ice engineering, and a road management plan for an ice crossing over the Mackenzie River, south of Norman Wells, Northwest Territories.
The client transported approximately 65-70 loads per day across the Mackenzie River, for close to 60 days, for an overall haul total of 130,000 tonnes. The program recorded zero ice related incidents during the season. The services provided improved efficiencies and cost savings for the client’s hauling program within a strong safety environment.
Client
NOR•EX Engineering
Project Highlights
65-70
transported loads per day
130,000t
for 60 days
More Infrastructure Projects
See all projects
Transportation
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design
Containment Systems
Asquith Landfill Decomissioning
Transportation
Cowichan Valley Trail Bridges Condition Inspection and Load Rating
Transportation
Ironworkers Memorial Second Narrows Bridge Fatigue Study
Infrastructure
West Edmonton Sanitary Sewer Tunnel W12
Land Development
Royal Bay Subdivision
Infrastructure
Buffalo Creek Culvert Replacement
Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services
Infrastructure
Lakeshore Drive Redevelopment
Energy
Site C Clean Energy
Airports
Christina Lake Infrastructure Upgrading
Water
Fort Chipewyan Water Treatment Plant Expansion
Infrastructure
Highway 69 Twinning
Transportation
Canmore Bridge Management
Infrastructure
Wildfire Infrastructure Rehabilitation Program
LEADERSHIP INSIGHTS
See all insights