The client undertook a large blasting and hauling operation as part of the infrastructure improvements supporting the Slater River Project.
NOR•EX Engineering provided safety services, ice engineering, and a road management plan for an ice crossing over the Mackenzie River, south of Norman Wells, Northwest Territories.
The client transported approximately 65-70 loads per day across the Mackenzie River, for close to 60 days, for an overall haul total of 130,000 tonnes. The program recorded zero ice related incidents during the season. The services provided improved efficiencies and cost savings for the client’s hauling program within a strong safety environment.
Client
NOR•EX Engineering
Project Highlights
65-70
transported loads per day
130,000t
for 60 days
More Infrastructure Projects
See all projects
Buildings
Stoney Nakoda Child & Family Services Building Assessment
Hydrotechnical
Medicine Hat Flood Assistance
Environmental
Growth and Economic Development Strategy
Infrastructure
Mooney Forest Service Road
Infrastructure
Raw Water Supply – Pipeline River Crossing
Computational Fluid Dynamics Analysis
E.L. Smith Water Treatment Plant Upgrade
Bridges
Deh Cho Bridge, Quality Management Services
Infrastructure
Gregoire Sanitary Sewer
Infrastructure
Medicine Hat Sidewalk Inventory and Asset Management Program
Infrastructure
Livestock and Forage Centre of Excellence
Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit
Streetscaping
Langford Cultural District
Strategic Advisory Services
Peterborough Streetlight Condition Assessment
Building Structures
Broadview Drive Commercial Development
Transportation
Canmore Bridge Management
LEADERSHIP INSIGHTS
See all insights