The client undertook a large blasting and hauling operation as part of the infrastructure improvements supporting the Slater River Project.
NOR•EX Engineering provided safety services, ice engineering, and a road management plan for an ice crossing over the Mackenzie River, south of Norman Wells, Northwest Territories.
The client transported approximately 65-70 loads per day across the Mackenzie River, for close to 60 days, for an overall haul total of 130,000 tonnes. The program recorded zero ice related incidents during the season. The services provided improved efficiencies and cost savings for the client’s hauling program within a strong safety environment.

Client
NOR•EX Engineering

Project Highlights
65-70
transported loads per day
130,000t
for 60 days
More Infrastructure Projects
See all projects

Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study

Transportation
Sutherland Ave Pedestrian Bridge

Transportation
Vancouver International Airport Rainwater Harvesting

Infrastructure
West Calgary Storm Sewer Relief

Infrastructure
Kluskus Village Domestic Water System Improvements

Infrastructure
Tsawwassen First Nation Sewage Treatment Plant

Climate Change Adaptation & Mitigation
Emergency Flood Damage Reduction Program

Infrastructure
North Kildonan Feedermain

Infrastructure
Livestock and Forage Centre of Excellence

Streetscaping
Langford Cultural District

Transportation
Glenmore Dam Utility Relocation

Infrastructure
Melville Water Treatment Plant

Infrastructure
Chippewas of Nawash First Nation – Roads and Culvert Flood Damage Repair

Airports
Inuvik Airport Runway Extension and Airside Civil Infrastructure Improvements

Downtown and Main Street Revitalization
Rocky Mountain House Main Street Reconstruction
LEADERSHIP INSIGHTS
See all insights