Location
Yellowknife, NWT
Expertise
Transportation
Share
The project was undertaken to improve transportation efficiencies on the Tibbitt to Contwoyto Winter Road (TCWR), while ensuring a high level of safety and no additional risk to winter road operators and drivers.
NOR•EX Engineering provided ice engineering design, ice loading tables, and quality assurance program for improved transportation up the TCWR to resupply three diamond mines north of Yellowknife. The project team provided the ice engineering design and overall quality assurance programs.
The enhancements saved the client 116 fewer truckloads in 2014; achieved a 5% increase in truck payload capacity until the Winter Road was operating at maximum capacity (100% Super B Gross Vehicle Weight); and provided an operational cost savings in excess of $600,000/year moving forward.
Project Highlights
More Transportation Projects
See all projects
Transportation
Pitt River Bridge
Transportation
Highway 7 Haney Bypass Intersection Improvements
Transportation
John Hextall Bridge Rehabilitation
Transportation
McKay River Bridge
Transportation
Transportation Planning and Functional Design of Burquitlam-Lougheed Neighbourhood Greenways
Bridges
SkyTrain Grandview Cut Structural Upgrade
Transportation
Canmore Bridge Management
Infrastructure
Churchill Airport Runway Upgrades
Transportation
Medicine Hat Boardwalk Replacements
Transportation
Ice Engineering and Ice Safety at Milne Inlet
Transportation
Haisla Bridge Replacement
Bridges
Moody Street Overpass
Transportation
Coast Meridian Overpass Detailed Inspection
Transportation
Northwest Territories ITS Program
Infrastructure
Highway 69 Twinning
LEADERSHIP INSIGHTS
See all insights