The project was undertaken to improve transportation efficiencies on the Tibbitt to Contwoyto Winter Road (TCWR), while ensuring a high level of safety and no additional risk to winter road operators and drivers.
NOR•EX Engineering provided ice engineering design, ice loading tables, and quality assurance program for improved transportation up the TCWR to resupply three diamond mines north of Yellowknife. The project team provided the ice engineering design and overall quality assurance programs.
The enhancements saved the client 116 fewer truckloads in 2014; achieved a 5% increase in truck payload capacity until the Winter Road was operating at maximum capacity (100% Super B Gross Vehicle Weight); and provided an operational cost savings in excess of $600,000/year moving forward.


Project Highlights
More Transportation Projects
See all projects

Transportation
Freegold Road Functional Plan

Transportation
St. Albert Transportation Master Plan

Transportation
Ice Engineering and Ice Safety at Milne Inlet

Transportation
Inuvik Airport Runway 06-24 Extension and Airside Civil Infrastructure Improvements

Transportation
McKay River Bridge

Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection

Transportation
7 Avenue S. Bike Boulevard

Active Transportation
Highway 1 at Mountain Highway Interchange

Bridges
SkyTrain Grandview Cut Structural Upgrade

Transportation
John Hextall Bridge Rehabilitation

Transportation
Kapuskasing River Bridge

Transportation
Highway 16 SAFE Corridor

Transportation
Medicine Hat Transit ITS Decision Support

Streetscaping
Nigel Valley Public Spaces

Transportation
170th Street over CN Rail Bridge Rehabilitations
LEADERSHIP INSIGHTS
See all insights