The Yellowknife Education District No.1 retained Associated Environmental to conduct a hazardous building material assessment of six schools, two accessory buildings, and one apartment building.
The District was required to identify any hazardous building materials at the buildings and record the liability of such materials for financial purposes. These materials were asbestos-containing materials, lead-based paint, polychlorinated biphenyls, mercury, ozone-depleting substances, and urea formaldehyde foam insulation.


Project Highlights
An assessment of above ground storage tanks and an inventory of fuels, chemicals, and cleaners on site was completed. The scope of the assessment included a room-by-room intrusive investigation to identify any hazardous materials in applicable architectural, mechanical, electrical, and civil applications. The objective of the assessment was to determine the presence and extent of hazardous materials at the buildings in order to develop health and safety protocols for workers when conducting renovations and operation and maintenance activities.
With the assessment completed, Associated is currently acting as Project Manager for communication to staff, students and the public, for training of maintenance staff on asbestos awareness, and for supervision of abatement activities.
More Contaminated Sites Management Projects
See all projects

Containment Systems
Main Street Historical Landfill Excavation

Transportation
Highway 7 Haney Bypass Intersection Improvements

Contaminated Sites Management
Beaufort Delta Designated Substance Surveys

Environmental
Francis Cooke Landfill Operations Plan

Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound

Building Mechanical
Hazardous Materials Survey and Abatement Monitoring

Contaminated Sites Management
Sioux Lookout Phase I Environmental Site Assessment

Environmental
Stage 1 & 2 Preliminary Site Investigations and Limited Detailed Site Investigation

Environmental
Phase I and II Environmental Site Assessments and Compliance Audit Great Glacier Salmon Plant and Camp

Contaminated Sites Management
Environmental Assessment for New Wastewater Facility

Active Transportation
Okanagan Rail Corridor Ballast Testing and ESA Reviews

Contaminated Sites Management
Phase I and II Environmental Site Assessment – Margaret’s Landing Development

Environmental Assessment
Phase I Environmental Site Assessment

Environmental
Phase II Environmental Site Assessment, Historical Downtown Whitehorse

Building Mechanical
Hazardous Materials Survey and Abatement Monitoring of Buildings
LEADERSHIP INSIGHTS
See all insights