Great Slave Lake Nutrient Risk Assessment and Treatment Improvement Options Study Fiddlers Lagoon Wastewater Treatment
Location
Yellowknife, NWT
Expertise
Environmental
Environmental Engineering
Water Treatment
Environmental Assessment
Share
The City of Yellowknife currently treats municipal wastewater by a lagoon and natural wetland system known as the Fiddler’s Lake Treatment System.
The System operates under the requirements of a water licence issued by the Mackenzie Valley Land and Water Board. The wastewater undergoes treatment as it flows through a network of stream channels, ponds, and wetlands until it is discharged through an open channel to Great Slave Lake.
The City retained Associated to gain a better understanding of the risks presented by nutrient loading to Great Slave Lake to determine whether the current and projected future loading of nutrients poses a risk of causing eutrophication in the immediate receiving area of the lake. We also conducted an independent evaluation of the feasibility and effectiveness of the options for treatment improvement identified in the System Plan.
Project Highlights
The 2017 monitoring program provided the first characterization of water quality in the receiving area of Great Slave Lake. To confirm the 2017 findings and assess year-to-year variation, we recommended monitoring the receiving area of the lake during the open water seasons in 2018 and 2019 for chloride, total and dissolved phosphorus, chlorophyll a, and other routine parameters. Our Treatment Improvements Options Analysis report provided possible treatment improvements and options for phosphorus removal.
More Environmental Projects
See all projects
Environmental
South Cranberry Creek Hydroelectric Facility Long-Term Environmental Monitoring
Environmental
Meadow Valley Groundwater Availability Study
Environmental
37 Street SW Storm Trunk Relocation
Environmental
Deh Cho Bridge, Environmental Services
Environmental Assessment
Phase I Environmental Site Assessment
Environmental
Growth and Economic Development Strategy
Environmental
John Matthews Creek Ravine Management Strategy and Creek Restoration
Environmental
Environmental Screening, Clearance Reporting and Post-Reclamation Construction Monitoring on Line 21
Environmental
Splatsin Eagle River Compensation Site Identification Site
Environmental Assessment
Environmental Assessment of Westside Road
Environmental Assessment
Liquid Waste Management Plan Environmental Impact Study
Fish, Wildlife & Ecosystems
Regional Wildlife Monitoring Plan
Environmental
Big Bend Master Drainage Plan
Contaminated Sites Management
Sioux Lookout Phase I Environmental Site Assessment
Environmental Planning
Regina Bypass – Environmental Services
LEADERSHIP INSIGHTS
See all insights