Location
Vancouver, British Columbia
Expertise
Transportation
Bridges
Bridge Rehabilitation & Retrofit
Seismic Evaluation & Retrofitting
Infrastructure
Share
Associated Engineering developed a bearing replacement scheme to address the removal of PCB contaminants in the main truss span bearings of this highly visible eight-lane structure.
Mandatory bearing replacement offered the ideal opportunity to upgrade the steel truss spans by installing base isolation bearings and enhancing seismic performance.
Seismic base-isolation design was carried out to extract optimal performance from the existing capacity-limited substructure. Key to bearing replacement was to develop a scheme to jack up the steel trusses, which had no jacking provision. Innovative designs were prepared for the complex temporary work needed to replace bearings of up to 7 MN load capacity.

Client
City of Vancouver

Project Highlights
Key services included:
- Inspection of the truss spans.
- Preliminary and detailed design for the bearing replacements.
- Integration of construction staging and public safety into the designs.
- Load rating of the truss spans using 3-D BIM and structural modeling.
- Structural evaluation, design, and construction services for concrete pier strengthening.
- Seismic assessment using modern bridge performance criteria.
- Development of environmental authorization applications, and liaison with Federal Agencies regarding application of PCB regulations to bridges.
More Transportation Projects
See all projects

Transportation
Overlea Blvd. Bridge Rehabilitation

Roads
Johnson-Mariner Way Connector

Transportation
BC Earthquake Integrated Asset Management Plan

Transportation
Haisla Bridge Replacement

Transportation
Highway 17 at County Road 508 Interchange

Transportation
Inuvik Airport Runway 06-24 Extension and Airside Civil Infrastructure Improvements

Infrastructure
Baxter Bridge Rehabilitation

Transportation
170th Street Pedestrian Bridge

Transportation
St. Andrews Lock and Dam Bridge Deck Replacement

Pedestrian Bridges
Hangingstone River Pedestrian Bridge

Bridges
Moody Street Overpass

Airports
Vancouver International Airport South Airfield Upgrades

Infrastructure
Churchill Airport Runway Upgrades

Transportation
Duggan Bridge Replacement

Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit
LEADERSHIP INSIGHTS
See all insights






