The City of Edmonton’s Gold Bar Wastewater Treatment Plant upgrade program continued with a $10 million capital works project.
Construction and commissioning was completed in December, 2004. This project, led by Associated Engineering in collaboration with sub-consultants UMA and Magna IV, included the design and construction of an eleventh 32 ML/d biological nutrient removal (BNR) treatment train. This project also included:
- A feasibility study for a 40 ML/d membrane based reuse quality water facility
- Evaluation of a 150 ML/d facility to disinfect secondary treatment bypass flows
- A new 320 ML/d alum storage and dosing facility
Project Highlights
Design of an alum dosing system for phosphorus removal was also performed by Associated Engineering to ensure year-round targets can be met under all foreseeable raw water conditions.
The City of Edmonton has progressively approached full plant conversion to a BNR process throughout the 1990’s, often in studies involving Associated Engineering. A number of reports and trials have been performed to confirm BNR capability and process stability under varying plant and climatic conditions.
More Infrastructure Projects
See all projects
Containment Systems
Asquith Landfill Decomissioning
Parks & Recreation
Pexsisen Elementary School
Transportation
Broadway Street Improvements
Transportation
St. Andrews Lock and Dam Bridge Deck Replacement
Water
Jericho Reservoir
Infrastructure
Drainage Improvement Study
Environmental
Port of Vancouver – Climate Change Adaptation
Infrastructure
Calgary Northwest Inner City Drainage Study
Infrastructure
Roads and Drainage Construction, Lake Babine Nation
Infrastructure
Mooney Forest Service Road
Downtown and Main Street Revitalization
West Rossdale Redevelopment
Environmental
Phase I Environmental Site Assessment of 10 Housing Units
Environmental
Splatsin Eagle River Compensation Site Identification Site
Infrastructure
Burnaby Lake Rowing Club Pavilion Floating Dock
Infrastructure
Oakville Fourth Line Closed Landfill
LEADERSHIP INSIGHTS
See all insights