Location
Kelowna, British Columbia
Expertise
Infrastructure
Roads
Electrical Instrumentation & Controls
Traffic Engineering
Intelligent Transportation Systems
Containment Systems
Share
In March 2011, the City of Kelowna retained Associated Engineering to complete the detailed design and construction management for the relocation of Glenmore Landfill Entrance Area.
The layout of the current entrance has been modified several times, but congestion at peak times has led to queuing onto Glenmore Road and adversely affected the operations of that corridor.
The preliminary design for the new entrance envisioned a new arterial road south of the landfill from which access to the site would be gained. This arterial is to ultimately connect through to the University of BC Okanagan and Highway 97. The entrance itself included new roads of sufficient length and width to accommodate queuing of landfill traffic, four new weigh scales, scale houses, public washroom, a hazardous waste drop off building, recycling facility, new transfer station, and a state-of-the art wheel wash facility for landfill trucks.
Client
City of Kelowna
Project Highlights
While this was a multi-disciplinary project, our Electrical Team provided the following scope of service:
- Electrical Utility, Shaw and Telus coordination and service application
- City of Kelowna Information Technology Services (ITS) coordination
- Site Electrical Distribution System
- General Site and Roadway Lighting
- Traffic Signals
- Building Electrical for Weight Scales & Washrooms
Associated Engineering also provided contract document preparation, tendering, contract administration, and construction inspection services.
More Infrastructure Projects
See all projects
Infrastructure
Gold Bar Wastewater Treatment Plant
Downtown and Main Street Revitalization
West Rossdale Redevelopment
Infrastructure
Highway 69 Twinning
Infrastructure
Greens on Gardiner
Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment
Infrastructure
Livestock and Forage Centre of Excellence
Land Use & Community Planning
Glory Hills Area Structure Plan
Building Structures
Bone Yard Operations Centre Office Expansion
Infrastructure
Pelham Patrol Yard Fuel Tank Replacement
Infrastructure
Pelican Lake First Nation Water Treatment Plant Expansion
Transportation
Don River Blvd. Bridge Rehabilitation
Environmental
Growth and Economic Development Strategy
Infrastructure
Roads and Drainage Construction, Lake Babine Nation
Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection
Infrastructure
Century Park
LEADERSHIP INSIGHTS
See all insights