As part of The City of Calgary’s ongoing Glenmore Dam Upgrade program, the existing bridge deck required replacement and new steel stop logs needed to be installed.
After extensive conceptual investigations, the decision was made to relocate both the feedermain and gas line via a tunnel beneath the Elbow River, directly downstream of the Glenmore Dam.
Key Aspects and Challenges
- New 1500 mm C300 concrete feedermain and 300 mm gas line located within a 1650 mm concrete tunnel
- Five (5) vertical access shafts, varying in depth from 7 m to 31 m, required for installation of the tunnel components, for construction
- Almost 700 m of 1650 mm diameter tunnel
- Tunnel crossing 9 m below the Elbow River, and tie-ins between the new and existing feedermains on each side of the tunnel to mitigate construction risk and improve redundancy.
- Multiple high-rise utility crossings, which the tunnelling contractor elegantly resolved by proposing a revised methodology to his and the City’s benefit; revised methodology included a sloped tunnel and added in access shafts to be used for tunnel construction.
- Narrow shutdown windows; the feedermain is critical to South.


Project Highlights
People on this project
More Transportation Projects
See all projects

Transportation
Still Creek Pedestrian Bridge Replacement

Pedestrian Bridges
Dayton Street Pedestrian and Cycling Overpass

Transportation
Highway 16 SAFE Corridor

Transportation
Highway 17 at County Road 508 Interchange

Bridges
Seymour Canyon Suspension Bridge

Transportation
Transportation Planning and Functional Design of Burquitlam-Lougheed Neighbourhood Greenways

Transportation
Canmore Bridge Management

Transportation
Coast Meridian Overpass

Transportation
Inuvik Airport Runway 06-24 Extension and Airside Civil Infrastructure Improvements

Transportation
170th Street Pedestrian Bridge

Transportation
Ice Engineering and Ice Safety at Milne Inlet

Transportation
Ironworkers Memorial Second Narrows Bridge Fatigue Study

Transportation
Kitsault Mine Access Road and Bridge Assessments

Airports
Vancouver International Airport Parallel Runway

Infrastructure
Churchill Airport Runway Upgrades
LEADERSHIP INSIGHTS
See all insights