The Government of the Northwest Territories retained Associated Engineering to evaluate the existing condition, load rate, and prepare life-cycle cost estimates for retrofit and replacement options for the Frank Channel and Kakisa River Bridges.
Both bridges are critical elements of the highway network in the Northwest Territories.
Associated Engineering conducted a close proximity inspection of both structures using a specialized inspection truck. Prior to conducting the inspections, a 3-D finite element model was created to evaluate the load rating based on CAN/CAS-S6-00 and identify any members that may be over-stressed or subject to high fatigue cycles. This work was then used to optimize the ultrasonic integrity inspections of the truss members.
We prepared a report that provided a Life Cycle Cost summary of the retrofit and replacement options, including total costs to 2053, salvage value, and expected residual life.
Client
The Government of the Northwest Territories
Project Highlights
More Bridges Projects
See all projects
Bridges
SkyTrain Grandview Cut Structural Upgrade
Active Transportation
Highway 1 at Mountain Highway Interchange
Transportation
McKay River Bridge
Bridges
Stony Trail/Bow River Bridge Fog Detection System
Bridges
Lake City Overhead Seismic Retrofit and Structural Rehabilitation
Transportation
Outlook Truss Bridge Assessment
Transportation
St. Andrews Lock and Dam Bridge Deck Replacement
Transportation
Granville Bridge Seismic Retrofit and Renewal
Bridges
Knight Street Bridge Upgrading
Transportation
Bobtail Forest Service Road Overpass
Bridges
Nass River Bridge Replacement
Transportation
Canmore Bridge Management
Bridges
Deh Cho Bridge, Quality Management Services
Active Transportation
Bon Accord Pedestrian Bridge
Seismic Evaluation & Retrofitting