Location
Fort McMurray, Alberta
Expertise
Energy
Electrical Instrumentation & Controls
Water
Wastewater Treatment / Water Resource Recovery
Share
For several years, Associated Engineering as a prime consultant has been providing on-going assistance with the Instrumentation and Controls operations of the Fort McMurray Wastewater Treatment Facility and Lift Stations within the RMWB.
This work included the control system design, PLC and SCADA programming and equipment upgrades with minimal impact to operations.
Support and upgrades work has included:
- PLC, SCADA and operational support since facility commissioning in 2009 through monthly on-site visits
- Implementation of HACH WIMs laboratory software and integration with SCADA Historian
- WWTP – New Septage Receiving Station PLC & HMI programming
- Lift Station – PLC, HMI and backup controller design, programming, and commissioning
- Plant PLC Upgrades Design – ACP-14, -23 and -52
Project Highlights
More Energy Projects
See all projects
Electrical Instrumentation & Controls
Solar Photovoltaic System Installation – WTP and Pumphouse
Energy
New Central Library Direct Energy Service Connection and Energy Transfer Station
Energy
Sylvan Lake Instrumentation & Control Services
Strategic Advisory Services
Lethbridge Energy Efficiency Master Plan and Strategy
Energy
Surrey Civic Centre Plaza
Energy
Solar Feasibility Study for Medicine Hat Reservoirs
Energy
Minoru Aquatic Complex
Building Mechanical
Yard Works Facility Emergency Backup Generator
Building Mechanical
Elijah Smith School Energy Audit
Energy
Gateway Theatre Wastewater Heat Recovery
Climate Change Adaptation & Mitigation
Nanaimo Reservoir No. 1 and Energy Recovery Facility
Energy
British Columbia Lottery Corporation Geoexchange Feasibility Study
Building Mechanical
Jim Pattison Centre of Excellence Building Technologies and Renewable Energy Conservation
Energy
Red Deer Wastewater Treatment Plant – PLC, Instrumentation and Controls Retrofit
Energy