The Main and Central Substations are the largest that Associated Engineering has designed.

We provided civil, structural and building mechanical engineering expertise on six substation yards (Main, Central, South West, Ore Preparation Plant, Extraction & Tailings, and Co-Gen), and 10 skid substations (four Shovel Subs, two Hydro-transport Booster Subs, two Tailings Booster Subs, one Barge Sub, and one Out-of-Pit Tailings Area [OPTA] Sub). The facilities were designed to deliver 13.8 kV power, the utilization voltage, to various locations within the Fort Hills Facility.

Map Image
Blue Section

Project Highlights

13.8 kV

power

Green Section

Careers

A career step in the right direction

We are recognized as one of Canada’s Best Managed Companies for 14 consecutive years but our achievements and reputation are only possible because of our amazing staff. We believe that a supported staff allows them to excel at what they do best, and provide the best possible service to our clients and communities.