Location
Fort McMurray, Alberta
Expertise
Building Structures
Electrical Instrumentation & Controls
Land Development
Share
The Main and Central Substations are the largest that Associated Engineering has designed.
We provided civil, structural and building mechanical engineering expertise on six substation yards (Main, Central, South West, Ore Preparation Plant, Extraction & Tailings, and Co-Gen), and 10 skid substations (four Shovel Subs, two Hydro-transport Booster Subs, two Tailings Booster Subs, one Barge Sub, and one Out-of-Pit Tailings Area [OPTA] Sub). The facilities were designed to deliver 13.8 kV power, the utilization voltage, to various locations within the Fort Hills Facility.
Project Highlights
13.8 kV
power
More Building Structures Projects
See all projects
Infrastructure
Kikendaasogaming Elementary School Deficiency Repairs
Building Mechanical
Jim Pattison Centre of Excellence Building Technologies and Renewable Energy Conservation
Buildings
Stoney Nakoda Child & Family Services Building Assessment
Water
Fort Chipewyan Water Treatment Plant Expansion
Building Structures
Kinsmen Park PotashCorp Playland
Building Structures
Elkford Community Centre
Infrastructure
Gitwinksihlkw Water Treatment Plant
Building Structures
Oliver Bowen Light Rail Vehicle Storage and Maintenance Facility
Water Treatment
Russell Binscarth Water Treatment Plant
Buildings
Riel Recreation Park Redevelopment
Buildings
Simon Fraser University Parcel 21
Building Mechanical
Van Kam Freight Way Terminal
Building Structures
Broadview Drive Commercial Development
Building Structures
Columbia Street Pump Station
Building Mechanical
Martensville Athletic Pavillion
LEADERSHIP INSIGHTS
See all insights