Location
Kelowna, British Columbia
Expertise
Pump Stations
Wastewater Collection & Storage
Share
In 2011 the District of West Kelowna (City of West Kelowna) engaged Associated Engineering to provide assessment report of the existing Faulkner Lift Station.
Upon assessment report, it was concluded that the existing lift station would require major upgrades to ensure municipality has infrastructure to meet their needs and future design considerations.
The required works included new building for electrical controls and power supply, and installation of new wetwell. The existing electrical and lift station was to remain operational throughout construction until completion of new infrastructure.
Associated Engineering provided preliminary and detailed design for this project, complete with full contract documents and specifications for mechanical, electrical, structural and civil disciplines. We provided contract administration and construction inspection services through completion of project.
Completion of the lift station was early 2015.
Client
The District of West Kelowna (City of West Kelowna)
Project Highlights
More Pump Stations Projects
See all projects
Energy
Process Energy Audits
Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment
Building Mechanical
Craigflower Pump Station
Infrastructure
Raw Water Supply – Pipeline River Crossing
Electrical Instrumentation & Controls
La Ronge and Air Ronge Municipal Utilities Back-Up Power
Pump Stations
Homer Watson Pump Station Upgrade
Building Mechanical
Scott Street Sewage Pumping Station Upgrades
Building Structures
Columbia Street Pump Station
Strategic Advisory Services
East Side Pump Station Asset Management Plan
Building Mechanical
Arbutus Water Treatment Plant
Pump Stations
Horseshoe Slough Drainage Pump Station
Environmental Engineering
Regina Hauled Waste Receiving Station
Infrastructure
Forest Lawn Lift Station
Water
Welland Water Treatment Plant
Pump Stations