The proposed Phase 1 and Phase 2 upgrades at Welland Water Treatment Plant are critically important initiatives to ensure a reliable and affordable water supply into the future for the Region of Niagara, including the City of Welland, the Town of Pelham, and the City of Thorold.
Associated Engineering was engaged by the Region to provide the following services related to the Phase 1 upgrades:
- Preliminary Design
- Detailed Design
- Tendering
- Contract Administration
- SCADA system programming and Integration
- Construction Inspection
- Warranty Period Services


Project Highlights
The major components of this assignment include upgrades in the following areas:
- Disinfection (UV System and Chlorination)
- High Lift Pump Station
- Treated Water Storage Reservoir
- Distribution Watermains
- Electrical
- Demolition of Existing Buildings (Plant 2)
- Demolition of Existing Treated Water Storage Reservoir
More Water Projects
See all projects

Water
Medicine Hat Flood Assistance

Transportation
Kitsault Mine Access Road and Bridge Assessments

Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment

Water
Mill Creek Erosion Study

Water
Source Watershed Assessment

Water
Edmonton City-Wide Flood Mitigation Assessment, Phase 2 – Area B

Water Treatment
Fairmont Chateau Lake Louise Water Treatment Plant Upgrades

Environmental
Emergency Flood Damage Reduction Program

Buildings
Belle River Water Treatment Plant

Infrastructure
Pelican Lake First Nation Water Treatment Plant Expansion

Water
Japan Gulch Ultraviolet Disinfection Facility

Infrastructure
Trestle No. 3 Rehabilitation and Steel Pipe Replacement

Building Mechanical
Powell River WWTP

Infrastructure
Gitwinksihlkw Water Treatment Plant

Water Resources
Pitt River Inter-Tidal Habitat
LEADERSHIP INSIGHTS
See all insights