Van Kam Freightways Ltd. ships over 1 billion pounds of goods annually in British Columbia and Alberta. Expansion of coverage required upgrades to the infrastructure system beginning with a new freight way terminal in Kelowna, BC.
The success of this terminal initiated construction of a second terminal one year later in Prince George, BC.
Associated Engineering’s assignment included the detailed design of a both freight way terminals. Each terminal consists of an 8500 ft2 engineered steel warehouse and 5000 ft2 engineered two-storey office building. The warehouse facility took advantage of a cost-effective pre-engineered building solution. The office building combined cross-laminated (CLT) timber floor panels on heavy timber framing with CLT shear walls and exterior timber walls made of structural insulated panels for a robust building construction.

Client
Van Kam Freightways Ltd.

Project Highlights
8500ft2
engineered steel warehouse
5000ft2
engineered office building
People on this project
More Building Mechanical Projects
See all projects

Building Mechanical
Oakmont Pump Station Upgrades

Building Mechanical
Yard Works Facility Emergency Backup Generator

Building Mechanical
Athabasca Regional Service Centre, Administration Building

Airports
Calgary Airport Glycol Treatment Facility

Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study

Pump Stations
12th Avenue Drainage Pump Station

Buildings
Climate Change Risk Assessment for Buildings

Building Mechanical
Hazardous Materials Survey and Abatement Monitoring of Buildings

Infrastructure
Tsawwassen First Nation Sewage Treatment Plant

Energy
Minoru Aquatic Complex

Building Mechanical
Powell River WWTP

Building Mechanical
Woodward WWTP Headworks Biofilter Upgrades

Buildings
Residuals Treatment Facility

Water
Jericho Reservoir

Building Mechanical